Laserfiche WebLink
I <br />Republican River Measurement Rules <br />By March 1, 2009, all wells shall either: <br />1. Be equipped with a totalizing flow meter <br />that is installed and maintained according <br />to manufacturer's specifications; or <br />2. Be equipped with an alternative method of <br />measurement that is granted a variance; or <br />3. Be declared inactive. <br />Republican River Measurement Rules <br />Notice of Compliance <br />By March 1, 2009, the owners of Wells shall <br />provide written information that includes: <br />1. The name /address of the owner of the Well; <br />2. Permit number; <br />3. Legal description of the well and irrigated land; <br />4. Meter manufacturer, size, and model number; and <br />5. Initial reading and date of installation to the <br />Division 1 Engineer. <br />5 <br />