My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Training, Hydrology. ect Substitute Water Supply Plan Review Form
CWCB
>
Water Supply Protection
>
DayForward
>
7001-8000
>
Training, Hydrology. ect Substitute Water Supply Plan Review Form
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2015 2:29:42 PM
Creation date
2/24/2015 9:57:16 AM
Metadata
Fields
Template:
Water Supply Protection
Description
Substitute Water Supply Plan Review Form
State
CO
Basin
Statewide
Date
9/5/2006
Author
Division of Water Resources
Title
Substitute Water Supply Plan Review Form
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> • Page 3 of 5 <br /> Depletion- Remediation <br /> Description of treatment Acre-feet pumped/month <br /> Rate of pumping(gpm) Percent of depletion <br /> Time of operation (min/day) Acre-feet/month depletions <br /> Other: <br /> Depletion- Industrial/Commercial <br /> Description of facility Acre-feet pumped/month <br /> List of uses of water Percent of depletion <br /> Rate of pumping(gpm) Acre-feet/month depletions <br /> Equipment washing Gallons/month <br /> Acre-feet/month <br /> Other: <br /> Depletion- Other <br /> Description of uses Acre-feet pumped/month <br /> Consumption (af/month) <br /> Not all uses of water can be described on this document. The specifics of different uses should be fully <br /> `.. documented with appropriations,consumptive uses,and return flows. <br /> Depletion- Total <br /> Evaporative Comments: <br /> Irrigation <br /> Drinking&Sanitary <br /> Remediation <br /> Industrial/Commercial <br /> Other Total monthly depletions <br /> Depletions - Lagged to River <br /> Distance to stream Is analysis accounted for <br /> Lagged analysis required? Transmissivity(gpd/ft) <br /> Lagged analysis provided? Specific Yield <br /> Method used for lagging Mothly lagged depletions <br /> Other: <br /> Refer to General Substitute Supply Plan Guidelines <br /> Colorado Division of Water Resources 9/5/2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.