My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRRIP Meetings North Platte 04/25/2011
CWCB
>
Water Supply Protection
>
DayForward
>
7001-8000
>
PRRIP Meetings North Platte 04/25/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 2:51:02 PM
Creation date
2/20/2015 11:00:38 AM
Metadata
Fields
Template:
Water Supply Protection
Description
Agenda, North Platte River Water Supply Update Divisions 1, 6
State
CO
NE
WY
Basin
North Platte
South Platte
Water Division
1
Date
4/25/2011
Author
Various
Title
Agenda, North Platte River Water Supply Update Divisions 1, 6
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Wyoming Area Office <br />Bureau of Reclamation <br />Page 2 of 2 <br />(1981 -2010) for comparison. Graph 1 through Graph 3 displays this information in graphical <br />format. The North Platte Pathfinder ownership filled on April 22. The North Platte Guernsey <br />ownership filled on March 15. <br />Assuming the Pathfinder Modification Project was in operation and the North Platte Pathfinder <br />ownership filled, the Pathfinder Environmental and the Wyoming Accounts would also be <br />expected to fill. <br />The Kendrick ownership is in priority for accrual, and is expected to fill (minus transfers to be <br />paid back from Re- Regulation) by the end of April 2011 based on current inflow conditions. <br />Glendo ownership filled on March 17, 2011. Releases from Guernsey Reservoir are expected to <br />be in response to re- regulation of natural flows, flood control, and downstream demand. <br />Reclamation will continue to update the North Platte River operating plans on a monthly basis in <br />response to changing inflow conditions. Reclamation will prepare the determination of <br />forecasted supply estimate again on May 1 and June 1 with regard to the need to allocate storage. <br />For additional information regarding current reservoir contents and releases, please call toll free <br />1- 800 - 253 -8737 or visit our website (http: /www.usbr.gov /gp) and follow the water operations <br />link to access Reclamation's HydroMet Data system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.