My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRRIP Request for Disbursement of Contibution No. 430
CWCB
>
Water Supply Protection
>
DayForward
>
7001-8000
>
PRRIP Request for Disbursement of Contibution No. 430
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 3:18:09 PM
Creation date
2/13/2015 11:11:32 AM
Metadata
Fields
Template:
Water Supply Protection
Description
PRRIP Request for Disbursement of Contibution 430 Agreement R12AC60020 12/08/2014
State
CO
NE
WY
Basin
South Platte
Water Division
1
Date
11/25/2014
Author
USBOR
Title
PRRIP Request for Disbursement of Contibution No. 430
Water Supply Pro - Doc Type
Budget
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ANdERSON CONSU[TINq ENGINEERS, INC. <br />Civil • Water Resources • Environmental <br />November 7, 2014 <br />Jerry Kenny, Ph.D. <br />Headwaters Corporation <br />41114th Avenue, Suite 6 <br />Kearney, NE 68845 <br />MECE-N <br />uvIRP� <br />Re: Platte River Recovery & Implementation Program (PRRIP) -Choke Point Evaluation <br />[ACE Project No. NEHEADWATERSO4.04] <br />Dear Jerry: <br />Enclosed is our invoice for services provided in support of the geomorphic investigations and planning <br />associated with the Platte River Recovery & Implementation Program (PRRIP). The services were provided <br />during the time period ending November 1, 2014 and specifically pertain to the evaluation of the Choke <br />Point near North Platte, Nebraska. During this time period the following work was completed. <br />• Evaluation of the alternative improvements to limit aggradation upstream of the highway <br />bridge. These alternatives included mechanical removal of vegetation in the upstream <br />reach along with enlargement of the channel through the bridge section. <br />• Documentation and development of initial results associated with the modeling efforts. <br />• Meeting with you to discuss the initial results. <br />A memo summarizing the results and recommendations associated with this effort is being completed and <br />finalized prior to submittal. <br />Should you have any questions related to the invoice or the work completed to date, do not hesitate to <br />contact me. <br />Sincerely, <br />ANdERSON CONSULTING ENGINEERS, INC. <br />Bradley A. Anderson, P.E. <br />President <br />BAA /tlw <br />Enclosure <br />P: \NEHEADWATERS04.04_Choke Point \Invoices \neheadwaters04- 04_Invoice Itrs.docx <br />375 East Horsetooth Road, Bldg. 5 • Fort Collins, CO • 80525 <br />Phone: (970) 226 -0120 • Fax: (970) 226 -0121 • www.acewater.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.