Laserfiche WebLink
DRAFT 10/17/2014 <br />G REy -:.- � E 'PW_Tt _ G__;� <br />GW Permit: No action required as lands have been certified <br />for GW irrigation. <br />GW Permit: GW Permit: No action required as lands have <br />been certified for GW irrigation. <br />SW Permit: Approval by DNR is not required for assignment. <br />SW right is subject to cancellation after 5 yrs of nonuse, and <br />SW Permit: Transfers are voluntary. The DNR generally <br />can subsequently be assigned if cancelled for nonuse. <br />ensures that the right is not subject to cancellation. DNR must <br />examine the proposed transfer and attached information to <br />determine if it is valid, including the amount of water <br />requested to be transferred (entire amount or CU portion) and <br />whether the transfer falls into the expedited or nonexpedited <br />category, and ensures approval would not harm other <br />appropriators. If relinquished and cancelled, private rights are <br />no longer active and cannot be assigned or transferred. <br />Lands irrigated by both SW <br />Lands irrigated by GW source exclusively. The SW irrigated acres are <br />NDP / IMP — 1997 combination of number of acres and crop type sets the baseline condition for new or expanded acres. <br />And GW sources. <br />relinquished/not assigned, and cancelled <br />Changes to that condition are evaluated when a Robust Review is performed, at which time the current number of acres and <br />crop types is evaluated and compared with the 1997 baseline. Annually, the cancelled SW right is reported under the IMP. <br />This action would not be reported to the GC in Nebraska's annual report. <br />GW Permit: No action required as lands have been certified for GW irrigation. <br />Natural Flow <br />Storage Use Appropriations: <br />SW Permit: Relinquishment is voluntary, and once cancelled <br />Not addressed <br />Appropriations: Not <br />after being relinquished, private rights are no longer active <br />addressed <br />DNR issues order of <br />and cannot be assigned or transferred. <br />DNR determines if the <br />cancellation (for what was <br />appropriation is <br />relinquished). The District may <br />appurtenant to the land <br />deliver that amount of stored <br />stated on the <br />water for irrigation to other <br />relinquishment, issues <br />land approved for irrigation, or <br />order of cancellation (for <br />within 5 years District may <br />what was relinquished) <br />assign that non - appurtenant <br />and within 5 years District <br />portion to another location (i.e. <br />may assign that non- <br />cancelling acres does not cancel <br />appurtenant portion to <br />the storage water available for <br />another location or <br />irrigation). Would also be <br />transfer the type or <br />subject to cancellation for non - <br />purpose. Would be subject <br />use on that number of acres, but <br />to cancellation after 5 yrs <br />can be subsequently assigned. <br />of nonuse, and can <br />subsequently be assigned <br />if cancelled for nonuse. <br />Lands irrigated by both SW <br />Lands irrigated by SW source exclusively. The GW irrigated acres are <br />NDP / IMP — 1997 combination of number of acres and crop type sets the baseline condition for new or expanded acres. <br />And GW sources. <br />transferred by NRD action. <br />Changes to that condition are evaluated when a Robust Review is performed, at which time the current number of acres and <br />crop types is evaluated and compared with the 1997 baseline. Annually, the transferred GW right is tracked and reported <br />through the IMPS. The well transfer permit is reported to the GC in Nebraska's annual report. <br />GW Permit: NRD evaluates the net impact to the stream to ensure no new depletion. Annually, the NRD well permitting <br />associated with a well is tracked and reported through the IMPS. The new well permit is reported to the GC in Nebraska's <br />annual report. <br />SW Permit: No action required <br />Lands irrigated by both SW <br />Lands irrigated by SW source exclusively. The GW irrigated acres are <br />NDP / IMP — 1997 combination of number of acres and crop type sets the baseline condition for new or expanded acres. <br />And GW sources. <br />decertified by NRD action. <br />Changes to that condition are evaluated when a Robust Review is performed, at which time the current number of acres and <br />crop types is evaluated and compared with the 1997 baseline. Annually, the transferred GW right is tracked and reported <br />through the IMPs. This action would be reported to the GC in Nebraska's annual report. <br />GW Permit: No action required. <br />SW Permit: No action required <br />Lands irrigated by GW <br />Irrigated lands transferred to a new location where they are irrigated by <br />NDP / IMP - 1997 combination of number of acres and crop type sets the baseline condition for new or expanded acres. <br />GW. <br />Changes to that condition are evaluated when a Robust Review is performed, at which time the current number of acres and <br />crop es is evaluated and compared with the 1997 baseline. Annually, the NRD well transfer permit is tracked and reported <br />G REy -:.- � E 'PW_Tt _ G__;� <br />