My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-152 Application
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2015-152 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2016 9:00:38 AM
Creation date
2/10/2015 10:43:12 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-152
CMS 77047
Contractor Name
Cortez, City of
Contract Type
Loan
County
Montezuma
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Meter Replacement Project <br /> B.5. <br /> Purpose: <br /> This project is needed to address the current and future metering needs for the City of <br /> Cortez. This project will bring our system into the future with a more stream lined billing <br /> system, data management and conservation by providing our customers with accurate <br /> consumption information. <br /> Need: <br /> The existing system is comprised of manual read meters, approximately 3400, that are <br /> old, age 25-40 years, inaccurate and failing to capture our customer's usage. The smart <br /> meter technology will provide data storage and the ability to proactively manage our <br /> distribution system. This investment will provide 20 years or more of accurate billing and <br /> tracking. Incorporating a meter change out program over the course of the effective life <br /> span will keep our system in this state. <br /> Facilities: <br /> This program will replace all existing meters within our service area, residential and <br /> commercial accounts. <br />
The URL can be used to link to this page
Your browser does not support the video tag.