My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-152 Feasability Study
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2015-152 Feasability Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2016 9:00:38 AM
Creation date
2/10/2015 10:43:10 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-152
CMS 77047
Contractor Name
Cortez, City of
Contract Type
Loan
County
Montezuma
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Cost Estimate <br /> Meters&Equipment-meters, encoders,interface, 6"antenna, cast iron bottom caps, <br /> N_Sight R900 AMR components <br /> Item Qty Price Total <br /> 5/8 x 3/4 T-10 3145 $ 166 $522,070 <br /> 1"T-10 102 $ 254 $ 25,908 <br /> 1.5"1-10 25 $ 427 $ 10,675 <br /> 2" T-10 102 $ 520 $ 53,040 <br /> 3"T-10 5 $ 1,771 $ 8,855 <br /> Trimble Nomad 900LE 1 $ 2,479 $ 2,479 <br /> Belt Clip Receiver 1 $ 1,783 $ 1,783 <br /> Trimble Nomad charger/cradle 2 $ 345 $ 690 <br /> MRX920 Mobile Collector 1 $ 5,875 $ 5,875 <br /> N_Sight R900 Software 1 $ 2,300 $ 2,300 <br /> MX900 Software-GIS Map 1 $ 1,725 $ 1,725 <br /> Training 1 $ 3,450 $ 3,450 <br /> Maintenance 1 $ 1,150 $ 1,150 <br /> Sub Total $640,000 <br /> Meter Installation-R900 AMR Components <br /> 5/8x3/4 meter w/R900i&antenna 3145 $ 35.00 $110,075 <br /> 1"meter w/R900i& antenna 102 $ 35.00 $ 3,570 <br /> 1.5"meter w/R900i&antenna 25 $100.00 $ 2,500 <br /> 2"meter wR900i &antenna 102 $100.00 $ 10,200 <br /> Holes cut in exist lids 3442 $ 6.87 $ 23,655 <br /> Sub Total $150,000 <br /> Meter Relocation-Removal of old meter, construction of new meter pit&installation of <br /> meter,encoders,interface, 6"antenna,cast iron bottom cap <br /> Meter&Pit Installation 180 $1,700.00 $306,000 <br /> Old meter removal 180 $300.00 $ 54,000 <br /> Sub Total $360,000 <br /> Billing Software for Finance to match R900 AMR software for City of Cortez HTE <br /> Financial Package <br /> Billing Software 1 $50,000 $ 50,000 <br /> Sub Total $ 50,000 <br /> Total $1,200,000 <br /> Implementation Schedule <br /> This project will take no longer than 120 days to be fully implemented. Tracking of water billing <br /> will occur as normal during the upgrade. Immediately upon completion; a monthly comparison <br /> of produced water(finished water from treatment plant)will be compared to the billed amounts. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.