My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150398 Contract
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150398 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2015 4:12:15 PM
Creation date
2/10/2015 7:48:11 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-151
C150398
Contractor Name
Louden Irrigating Canal & Reservoir Company
Contract Type
Loan
County
Larimer
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
H. Interest during completion of the PROJECT pursuant to Paragraph A.4 of the <br /> CONTRACT. <br /> I. Legal services for reviewing engineering services contracts, reviewing this <br /> J. CONTRACT, reviewing construction contract documents, and for complying with all <br /> federal, state, and local regulatory requirements. <br /> K. PROJECT-related expenses incurred prior to the Effective Date of this CONTRACT in <br /> accordance with the approval of this loan. <br /> L. Pay off of existing loan to Western States Bank. <br /> SECTION 10—DISBURSEMENT SCHEDULE <br /> For project expenses: The BORROWER shall prepare a periodic progress report <br /> which contains a statement of the PROJECT costs expended for that period and shall <br /> forward said statement to the CWCB. After receipt of the periodic progress report <br /> from the BORROWER, and review and acceptance of the items therein as eligible <br /> expenses as described above, the CWCB will pay to the BORROWER the amount set <br /> forth in the report or such portion that has been approved by the CWCB. Such <br /> payment shall be made within thirty (30) days from the CWCB's approval of each <br /> progress report. <br /> For loan payoffs: For loan disbursements to pay off existing debt described in <br /> Section 5, the BORROWER shall provide the CWCB with a request that includes the <br /> amount needed to pay in full the existing loan, the loan number, the name and <br /> address of the creditor, the phone number and name of creditor contact. After <br /> review and acceptance of the request, the CWCB will pay to the Borrower the <br /> amount set forth in the request. Payment of said request shall be made within thirty <br /> (30) days from the CWCB's approval of said request. <br /> SECTION 11 —TIME FOR PERFORMANCE <br /> PROJECT BEGINS: Upon Effective Date of this CONTRACT (the date this CONTRACT iS <br /> signed by the State Controller or his designee). <br /> PROJECT END DATE: Three (3) years from the Effective Date of this CONTRACT <br /> Appendix 1 to Loan Contract C150398 <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.