My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150398 Contract
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150398 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2015 4:12:15 PM
Creation date
2/10/2015 7:48:11 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-151
C150398
Contractor Name
Louden Irrigating Canal & Reservoir Company
Contract Type
Loan
County
Larimer
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BORROWER: LOUDEN IRRIGATING CANAL& AGENCY NAME: COLORADO WATER <br /> RESERVOIR COMPANY CONSERVATION BOARD/PDA <br /> CONTRACT No. C150398 CONTRACT TYPE: LOAN/PRIVATE <br /> PROJECT AMOUNT: 160,000 CWCB CMS#69494/CORE: CT2015-151 <br /> LOAN SERVICE FEE: 1,600 <br /> LOAN AMOUNT: 161,600 <br /> LOAN CONTRACT <br /> (STANDARD CONTRACT-WAIVER#160-APPROVED NOVEMBER 10,2003) <br /> THIS CONTRACT is made between the State of Colorado for the use and benefit of <br /> The Department of Natural Resources, Colorado Water Conservation Board ("CWCB" or <br /> "State"), and the Louden Irrigating Canal & Reservoir Company, 8109 South County <br /> Road 9, Fort Collins, Colorado 80528, ("BORROWER"), a Colorado nonprofit corporation. <br /> FACTUAL RECITALS <br /> 1. Authority exists in the law, and funds have been budgeted, appropriated and <br /> otherwise made available and a sufficient unencumbered balance thereof remains <br /> available for encumbering and subsequent payment of this CONTRACT; and <br /> 2. Required approval, clearance, and coordination have been accomplished from and <br /> with appropriate agencies; and <br /> 3. On May 22, 2014 the CWCB approved a loan request from the BORROWER for the <br /> Emergency Diversion Structure and Ditch Project to repair damages caused by the <br /> 2013 flood event ("PROJECT"). The total estimated project cost is $215,000. The total <br /> loan amount is $161,600 which includes a one percent (1%) loan service fee of <br /> $1,600. This loan was approved as a 30 year loan at the interest rate of 2.70%. <br /> 4. The PROJECT SUMMARY, attached as APPENDIX 1 and incorporated herein, contains <br /> BORROWER Information (Section 1), the PROJECT Description (Section 2), CWCB's <br /> authority for making this loan (Section 3), and CWCB Approval and Legislative <br /> Authorization (Section 4), identifying the amount of the loan and the terms of <br /> repayment. The PROJECT SUMMARY also contains sections on BORROWER'S debt, <br /> collateral, procedures and eligible expenses. <br /> 5. The CWCB now desires, by this CONTRACT, to loan money to the BORROWER for this <br /> PROJECT upon mutually agreeable terms and conditions. <br /> THEREFORE, in consideration of the mutual and dependent covenants contained <br /> herein, the parties agree as follows: <br /> A. LOAN PROVISIONS <br /> 1. Loan Service Fee. The amount of the loan (LOAN AMOUNT) shall include (1) the <br /> amount of the funds loaned by the CWCB to the BORROWER for the PROJECT and (2) <br /> a service fee of one percent (1%) of the PROJECT amount. In the event that the <br /> Loan Contract C150398 <br /> Page 1 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.