My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPWRAP Meeting Agenda July 17, 2014
CWCB
>
Water Supply Protection
>
DayForward
>
7001-8000
>
SPWRAP Meeting Agenda July 17, 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 3:37:37 PM
Creation date
2/9/2015 3:18:38 PM
Metadata
Fields
Template:
Water Supply Protection
Description
SPWRAP Board Meeting Agenda and supporting documentation for July 2014, held in Berthoud, CO.
State
CO
Basin
South Platte
Water Division
1
Date
7/17/2014
Author
South Platte Water Related Activities Program, Inc.
Title
South Platte Water Related Activities Program, Inc. Board Meeting Agenda
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Heyborne Recharge and Wildlife Project— July 17th, 2014 Update to SPWRAP <br /> ., <br /> v F <br /> . <br /> .. .. .-. <br /> d'. .. <br /> - Itripir., - .-r.,... .:,;", <br /> . ,t, , „...-,, , 'k4e,- <br /> FLT <br /> it <br /> D ' 4 <br /> _-I s i t ap •�. <br /> •off liN4. � <br /> �, , Wit ° 1 <br /> September 16th, 2013 October 31st, 2013 <br /> The Heyborne Recharge and Wildlife Project experienced substantial damage during the 2013 flood, <br /> primarily to existing river bank and the slough channel so that the existing slough pond used for the <br /> floating pump is no longer in existence for use as previously operated. No damage occurred to the existing <br /> pump,piping, manifold or electric transformer. Ducks Unlimited has designed a repair project to restore <br /> operations of HRWP that includes construction of the following: bank repair and stabilization, slotted <br /> infiltration piping,pond and slough embankments, headgate installation, infiltration manhole, and piping <br /> from lift pump to manifold system. The total cost of the repair project is estimated at$259,517 to be paid <br /> for out of the Colorado Water Conservation Board's Species Conservation Trust Fund. The Lower South <br /> Platte Water Conservancy District and the Northern Colorado Water Conservancy District will administer <br /> funds from CWCB to Ducks Unlimited via separate Purchase Orders from CWCB and contracts with <br /> Ducks Unlimited. Project is estimated to be complete in 2014. <br /> 1 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.