Laserfiche WebLink
• <br /> THE GREELEY IRRIGATION COMPANY <br /> P.O. Box 445 <br /> Greeley, CO 80632 <br /> (970) 353-6121 <br /> (970) 353-9703 (fax) <br /> December 26, 2011 <br /> Kirk G. Russell, P.E. <br /> Colorado Water Conservation Board <br /> 1580 Logan Street, Suite 750 <br /> Denver, CO 80203 <br /> Re: Greeley Canal No. 3 Rehabilitation and Upgrade Project—Contract No. C150239 <br /> Dear Mr. Russell: <br /> Greeley Irrigation Company is requesting an extension on Contract No. C150239. <br /> Following is information regarding the extension. <br /> The loan was to be used to rehabilitate and upgrade the Greeley Canal No. 3. <br /> The Company has completed various projects, including the main river diversion project, <br /> the Highway 34 structure, piping and reshaping portions of the ditch, installation of some <br /> measuring devices, and tree removal. <br /> The Company is requesting an additional two years to complete the projects under the <br /> loan. It is unknown at this time if the projects scheduled for this year (installation of additional <br /> measuring devices, removal of unused headgates, repair of existing headgates, piping (or <br /> similar) on the eastern end of the ditch, and additional rip-rap and repairs on the ditch as <br /> needed) will be completed prior to the start of the irrigation season. These projects would be <br /> completed next winter. Additionally for the coming year, the Company is looking at replacement <br /> of a headgate structure where there is washing around the structure and possibly some more <br /> piping (or similar) on the eastern end of the ditch. <br /> To date, the Company has received $1,013,157.60 from the loan. The funds remaining <br /> available under the loan will be sufficient to finish the projects anticipated under the loan. <br /> Interest will be paid through December 31, 2011. <br /> Please let me know if you need further information. <br /> Yours very truly, <br /> Donna L. Coble <br /> Secretary <br />