My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-142 Contract
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
CT2015-142 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2015 10:01:22 AM
Creation date
2/9/2015 10:01:20 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-142
Contractor Name
Supply Irrigation Ditch Company
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BORROWER: THE SUPPLY IRRIGATING DITCH AGENCY NAME: COLORADO WATER <br /> COMPANY CONSERVATION BOARD/PDA <br /> REQUESTED LOAN AMOUNT$321,000 CONTRACT TYPE: LOAN/PRIVATE <br /> LOAN SERVICE FEE $3,210 CWCB CMS:74820/CORE:CT2015-142 <br /> LOAN AMOUNT $324,210 <br /> LOAN CONTRACT <br /> (STANDARD CONTRACT—WAIVER#160—APPROVED NOVEMBER 10,2003) <br /> THIS CONTRACT, made between the State of Colorado for the use and benefit of The <br /> Department of Natural Resources, Colorado Water Conservation Board ("CWCB" or <br /> "STATE"), and The Supply Irrigating Ditch Company, Guaranty Bank and Trust Building, <br /> Second Floor, 401 Main Street, Longmont, Colorado, 80501, ("BORROWER"), a Colorado <br /> nonprofit corporation. <br /> FACTUAL RECITALS <br /> 1. CWCB authority exists in the law, and funds have been budgeted, appropriated and <br /> otherwise made available and a sufficient unencumbered balance thereof remains <br /> available for encumbering and subsequent payment of this CONTRACT; and <br /> 2. Required approval, clearance, and coordination have been accomplished from and with <br /> appropriate agencies; and <br /> 3. On November 20, 2014, the CWCB approved a loan request from the BORROWER for <br /> the Emergency Supply Ditch Rehabilitation Project to repair the damage caused by the <br /> 2013 flood event. The BORROWER completed temporary repairs to allow for water <br /> diversions during irrigation season. The purpose of this loan is to the fund the <br /> permanent repairs ("PROJECT"). This loan was approved as a 30 year loan with no <br /> payments and zero interest for the first three years followed by 27 years of amortized <br /> payments at the interest rate of 2.25%. <br /> 4. The PROJECT SUMMARY attached as APPENDIX 1 and incorporated herein, contains <br /> BORROWER Information (Section 1), the Project Description (Section 2), CWCB's <br /> authority for making this loan (Section 3), and CWCB Approval and Legislative <br /> Authorization which identifies the amount of the loan and the terms of repayment <br /> (Section 4). The PROJECT SUMMARY also contains sections on BORROWER'S debt, <br /> collateral, procedures and eligible expenses; and <br /> 5. The CWCB now desires, by this CONTRACT, to loan money to the BORROWER for this <br /> PROJECT upon mutually agreeable terms and conditions. <br /> THEREFORE, in consideration of the mutual and dependent covenants contained <br /> herein, the parties agree as follows: <br /> A. LOAN PROVISIONS <br /> 1. Loan Service Fee. The amount of the loan (LOAN AMOUNT) shall include (1) the <br /> amount of the funds loaned by the CWCB to the BORROWER for the PROJECT and (2) <br /> a service fee of one percent (1%) of the PROJECT amount. In the event that the <br /> BORROWER does not use the LOAN AMOUNT authorized, the parties shall amend this <br /> Page 1 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.