My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
San Juan Dolores Draft Instream Flow Recommendation
CWCB
>
Water Supply Protection
>
DayForward
>
7001-8000
>
San Juan Dolores Draft Instream Flow Recommendation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 3:29:11 PM
Creation date
2/6/2015 2:31:17 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Related to the proposed Delores River ISF near Gateway from BLM to Linda Bassi, CWCB
State
CO
Basin
San Juan/Dolores
Date
5/14/2013
Author
Roy Smith
Title
DRAFT INSTREAM FLOW RECOMMENDATION
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
period from August 15 through March 14, an average of 16,000 acre feet of water would <br /> still be available for future development. <br />
The URL can be used to link to this page
Your browser does not support the video tag.