My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-140 Contract
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
CT2015-140 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 3:28:57 PM
Creation date
2/3/2015 3:23:46 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-140
Contractor Name
Northern Colorado Water Conservancy District
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E. Fish and wildlife mitigation measures required by federal, state, or local laws and <br /> regulations. <br /> F. Actual construction as called for in the design documents and in change orders <br /> approved by the CWCB and the BORROWER. <br /> G. Engineering services for construction management, including design and <br /> construction management for CWCB approved change orders. <br /> H. Legal services for reviewing engineering services contracts, reviewing this <br /> CONTRACT, reviewing construction contract documents, and for complying with all <br /> federal, state, and local regulatory requirements. <br /> I. PROJECT-related expenses incurred prior to the Effective Date of this CONTRACT in <br /> accordance with the approval of this loan. <br /> J. Design and construction services incurred by Mountain Parks Electric Inc. <br /> (MPEI) for interconnection of the PROJECT to the MPEI electrical grid. <br /> K. Resident inspection and equipment installation. <br /> SECTION 9—DISBURSEMENT SCHEDULE <br /> For PROJECT costs: The BORROWER shall prepare a written request for funds. After <br /> receipt of the written request from the BORROWER and review and acceptance of the <br /> items therein as eligible expenses, as described above, the CWCB will pay to the <br /> BORROWER the amount set forth in the request or such portion that has been <br /> approved by the CWCB. Such payment shall be made within thirty (30) days from <br /> the CWCB's approval of each request. <br /> SECTION 10—TIME FOR PERFORMANCE <br /> PROJECT BEGINS: Upon Effective Date of this CONTRACT (the date this CONTRACT is <br /> signed by the State Controller or his designee). <br /> PROJECT END DATE: Three (3) years from the Effective Date of this CONTRACT. <br /> Appendix 1 <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.