Laserfiche WebLink
Moltz Constructors,Inc. Page 4 <br /> CONTII Phase II Continental 10/23/2014 12:46 <br /> Direct Cost Report <br /> Activity Desc Quantity Unit Perm Constr Equip Sub- <br /> Resource Pcs Unit Cost Labor Materi Matl/Ex MentContrac Total <br /> BID ITEM= 24000 <br /> Description=Clearing&Grubbing Unit= AC Takeoff Quan: 2.000 Engr Quan: 2.000 <br /> 0.0223 MH/Uni 44.8056 Unit/MH <br /> 200^ Had and�o of I t' Qu :1,13000 CY,H� .,. ¢ . <br /> 402-10ED 10 CY End Dump Su 1.00 113.00 HR <br /> ---->Item Totals: 24000 - Clearing&Grubbing <br /> $0.00 18.0000 MH/AC 36.00 MH [ <br /> 0.000 2 AC <br /> BID ITEM = 25000 <br /> Description= Stripping&Stockpiling Topsoil Unit= CY Takeoff Quan: 1,320.000 Engr Quan: 1,320.000 <br /> 6" of topsoil removed equals bid quantity <br /> 8DZ6 D6, 11'Blade, 140 hp, 1.00 30.00 HR <br /> 8L250 Kom 250 Ldr-25k L 30.00 HR <br /> O ==>Operator 1.00 60.00 MH <br /> 0.0454 MH/CY 60.00 MH [ <br /> 0.0455 MH/Uni 22.0000 Unit/MH <br /> ---->Item Totals: 25000 - Stripping&Stockpiling Topsoil <br /> $0.00 0.0454 MH/CY 60.00 MH [ <br /> 0.000 1320 CY <br /> BID ITEM= 26000 <br /> Description=Unclassified Excavation-Filter Blanket Unit= CY Takeoff Quan: 8,625.000 Engr Quan: 8,625.000 <br /> � <br /> to�•o , py **At <br /> v � 3 + <br /> O Operator 107.81 CH Prod: 80.0000 UM Lab Pcs: 1.00 Eqp Pcs: 1.00 <br /> 8DZ6 D6, 11'Blade, 140 hp, 1.00 107.81 HR <br /> O Operator 1.00 107.81 MH <br /> 0.0124 MH/CY 107.81 MH [ <br /> 0.0125 MH/Uni 80.0019 Unit/MH * 1.1550 $/Unit <br /> Cv �k k <br />