My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150528 Request for Increase
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150528 Request for Increase
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2015 1:26:20 PM
Creation date
1/28/2015 1:26:19 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-006
C150365
Contractor Name
Santa Maria Reservoir Company
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Moltz Constructors, Inc. <br /> 63 Rd.2ABN Phone 307-527-7166 <br /> P.O. Box 1030 FAX 307-587-4357 <br /> Cody,WY 82414 <br /> October 23, 2014 <br /> URS Corporation <br /> 8181 East Tufts Avenue <br /> Denver, CO 80237 <br /> Re:Continental Dam Rehabilitation—Phase II Proposal <br /> Mr. Scott Jones, <br /> The enclosed bid is predicated on the assumptions, exclusions, clarifications and comments herein. This <br /> document shall be included in the Contract Agreement. All terms defined herein shall be considered binding <br /> and shall govern over all contract documents issued to Moltz Constructors. <br /> List of Assumptions within Costs and Approach <br /> - Dewatering was removed ($40,000) <br /> o The cost for dewatering was removed for the filter blanket work as the reservoir will be <br /> drained per SEO direction. If dewatering is required we can provide on a T&M basis. <br /> - Common Fill cost was reduced ($138,861) <br /> o This cost was reduced with the understanding that it is acceptable to excavate material <br /> onsite, screen to 3" minus, and use for common fill. <br /> - Erosion &Sediment Control ($5,000) <br /> o This cost was reduced because we have left over material from this season that can be <br /> utilized for next year installation. <br /> - Drain Gravel and Sand ($0.00) <br /> o If Moltz can persuade CDOT to lower their royalty then processing the material closer to the <br /> dam will result in additional savings which Moltz will pass on to SMRC. <br /> Please see the revised bid schedule from the result of the above credit. <br /> In conclusion, it is our intent to work with URS and SMRC to make sure that the project is successful and water <br /> storage can commence next fall. Please do not hesitate to contact me with any questions or concerns. We <br /> hope that our reduction shows our desire to complete this project. Thank you for the opportunity. <br /> Respectfully, <br /> Thomas P. Moltz <br /> President <br /> Moltz Constructors, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.