My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150365 Increase Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150365 Increase Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2015 9:33:14 AM
Creation date
1/28/2015 9:33:14 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-006
C150365
Contractor Name
Santa Maria Reservoir Company
Contract Type
Loan
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Santa Maria Reservoir Company Consent Agenda Item 4b <br /> January 26-27,2015 Board Meeting(Updated January 28,2015) <br /> Page 2 of 4 <br /> Guidance <br /> At the May, 2005 Board Meeting, the Board authorized staff to present increases to existing loans less <br /> than 20%of the original loan as Consent Agenda Items. The Santa Maria Reservoir Company loan <br /> increase presented below is approximately 16%of the loan amount. <br /> Background <br /> The Company provides irrigation water to approximately 70,000 acres in Rio Grande, Saguache, <br /> Conejos, and Alamosa Counties, in the San Luis Valley. The Company owns and operates two <br /> reservoirs: Santa Maria and Continental. The reservoirs are located in Hinsdale and Mineral Counties, <br /> about 20 miles southwest of the Town of Creede. Santa Maria receives regulated discharges from <br /> Continental through a century old conveyance system comprised of a pipeline, siphon and an open <br /> ditch. <br /> Continental was designed in 1910 and was constructed between 1925 and 1928 with a design capacity <br /> of 27,000 AF; however, due to seepage and spillway deterioration, it has been limited by the SEO to a <br /> storage capacity of 15,000 AF for the past 20 years. <br /> The objective of this Project is to rehabilitate the Continental dam and restore the full storage <br /> capacity of the reservoir by repairing the spillway and installing a filter blanket to address seepage. <br /> Project Update <br /> The Project was bid in March of 2014. Moltz Constructors, Inc. of Cody, Wyoming was awarded the <br /> construction contract. Construction began on the spillway rehabilitation at Continental dam in May of <br /> 2014. Most of the spillway work was completed in the summer of 2014. The filter blanket work is <br /> scheduled for the 2015 construction season. <br /> The contractor's bid was higher than the estimate used for funding purposes. The Company chose to <br /> move forward with the Project and agreed to work with the contractor and engineer (URS, <br /> Inc./AECOM) to further investigate the site conditions to see if a more cost-effective approach could <br /> achieve the desired result of addressing seepage, thereby allowing the Company to store its full water <br /> rights decree. Table 1 summarizes the increased construction cost estimate. The current Project <br /> estimate is based on numbers provided by the contractor. <br /> TABLE 1: UPDATED PROJECT COST SUMMARY <br /> Task Original Current Project <br /> Project Estimate Estimate <br /> Engineering/Construction Management $431,000 $431,000 <br /> Construction $3,584,000 $5,200,000 <br /> Admin $40,000 $40,000 <br /> Total $4,055,000 $5,640,000 <br /> Schedule: Construction will resume as soon as weather permits in 2015 with completion anticipated by <br /> the fall of 2015. <br />
The URL can be used to link to this page
Your browser does not support the video tag.