My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2016-1007 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2016-1007 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2015 9:46:51 AM
Creation date
1/26/2015 3:51:22 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2016-1007
Contractor Name
Las Animas Consolidated Canal Company
Contract Type
Loan
County
Bent
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fi•ure 1: Existin• Structure Failure <br /> ---. ... <br /> r'. <br /> , <br /> w <br /> e <br /> ,wY f`4K <br /> VR, <br /> v I\ <br /> wm <br /> A <br /> i <br /> 4 <br /> wen <br /> Prior to failure, the spillway structure controlled the flow of water entering the head of the <br /> ditch in accordance with Company water rights, while allowing excess water and sediment to <br /> spill back to the Arkansas River. The purpose of this project is to replace the spillway <br /> structure similar to the original design, but with additional control and safety measures to <br /> allow automated canal operations, including response to similar flooding conditions in the <br /> future. Modernization of this structure will improve routine canal operations and safety, in <br /> addition to mitigating future canal failure risk. <br /> September 20aft <br /> Page14 Drl 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.