My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 09/13/1984 J. William Mcdonald Director and Secretary
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
DayForward
>
2001-3000
>
Board Meeting 09/13/1984 J. William Mcdonald Director and Secretary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2015 9:22:04 AM
Creation date
1/5/2015 9:10:13 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/13/1984
Description
Minutes, Agenda, Memorandums, Notes September 13,14, 1984
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1Jif , . • <br /> • <br /> February 22 , 1984 <br /> Face � f <br /> J. William McDonald, Director •44, �� <br /> Colorado Water Conservation Board `�'i'17/011 <br /> '9�F <br /> Department of Natural Resources 80�� <br /> 823 State Centennial Building <br /> 1313 Sherman Street <br /> Denver, CO 80203 <br /> Dear Mr. McDonald: <br /> Thank you for your letter of January 25 , 1984 , outlining your <br /> reasons for continuing to assert the belief that the project <br /> completed by the Henry Waneka Mutual Reservoir Company and <br /> the one studied under Contract #C153334 with the Water Conser- <br /> vation Board are the same project. We, however, maintain that <br /> the two projects are very different. We hope a closer look at <br /> the facts will clarify the apparent misunderstandings revolving <br /> around the projects . A summary of the significant elements is <br /> as follows : <br /> A. Basis for Projects <br /> 1. The. State Engineer's Office placed a volume restriction <br /> on the reservoir, May 23 , 1979 . It explained that this <br /> "hold order" would be enforced until the dam was brought <br /> up to minimum standards . The "hold order" referenced <br /> another letter of June 29 , 1978 , which outlined the <br /> specific improvements that had to be made , to bring <br /> Waneka up to minimum standard. <br /> 2. The WCB study of September, 1981 , was basically a <br /> report on the feasibility of enlarging Waneka Reservoir <br /> and that was its principal conclusion and recommendation. <br /> The data and standards specified (and required) by the <br /> SEC for Waneka were already existing 3 years prior to <br /> the WCB report. The WCB report only reiterated what <br /> was already common knowledge and very specific in <br /> instructions for minimum standards. <br /> 3 . If we wanted to utilize the full capacity of Waneka , <br /> then, we had to comply with the State Engineer' s orders . <br /> There was no room for negotiation. Logically, we would <br /> not instigate an engineering study to investigate the <br /> 201 East Simpson Street • Lafayette, Colorado 80026 .(303) 665-2380 <br />
The URL can be used to link to this page
Your browser does not support the video tag.