My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 09/13/1984 J. William Mcdonald Director and Secretary
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
DayForward
>
2001-3000
>
Board Meeting 09/13/1984 J. William Mcdonald Director and Secretary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2015 9:22:04 AM
Creation date
1/5/2015 9:10:13 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/13/1984
Description
Minutes, Agenda, Memorandums, Notes September 13,14, 1984
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Otynf ,. • <br /> Certified Mail <br /> P 433 606 348 <br /> • <br /> August 15, 1983 • <br /> • <br /> N. C. Ioannides, Chief <br /> Project Planning and Construction <br /> Section <br /> Colorado Water Conservation Board <br /> 1313 Sherman Street <br /> Denver, CO 80203 Re: Feasibility Repayment <br /> Dear Mr. Ioannides: <br /> As a - result of our recent meeting and a review of the contract <br /> betcveen the Henry Waneka Mutual Reservoir Company (HWMRC) and <br /> the Colorado Water Conservation Board (CWCB) , no justification <br /> . was found for concluding that the project as contemplated in <br /> said contract or in the final report entitled Engineering and <br /> Feasibility Report for the Rehabilitation and Enlargement of <br /> Waneka. Reservoir Dam as accepted by CWCB was constructed by <br /> the Reservoir Company. <br /> The foregoing position is based on several points as follow: <br /> . the title of the report prepared by Water <br /> Resources Consultants (WRC) indicates that the • <br /> project contemplated was the rehabilitation and <br /> enlargement of Waneka Reservoir dam; <br /> . the recommendation of WRC which resulted from <br /> the feasibility report was for the enlargement <br /> of the dam; <br /> . the rehabilitation of the dam completed by HWMRC <br /> was based on engineering and feasibility work <br /> done by an entirely different engineering firm, <br /> Zorich and Associates; <br /> . Section 5 of the CWCB/HWMRC contract states <br /> ". . .the Contractor shall pay to the State the <br /> 201 East Simpson Street • Lafayette, Colorado 80026 •(303) 665-2380 <br />
The URL can be used to link to this page
Your browser does not support the video tag.