My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 03/03/1983
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
DayForward
>
2001-3000
>
Board Meeting 03/03/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2014 11:47:28 AM
Creation date
12/3/2014 3:47:52 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/3/1983
Description
Minutes, Agenda, Memorandums March 3, 1983
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COLORADO WATER CONSERVATION BOARD <br /> 823 State Centennial Building <br /> 1313 Sherman Street <br /> Denver, Colorado 80203 <br /> March, 1983 <br /> Stagecoach Reservoir Project <br /> (Upper Yampa Water Conservancy District) <br /> Introduction <br /> The Stagecoach Reservoir site is located on the Yampa River <br /> about 3 miles east of the towns of Phippsburg and Oak Creek. <br /> The proposed project would create a reservoir of about 33,700 <br /> acre-feet, of which 3,500 acre-feet would be inactive storage. . <br /> Study Status <br /> The District submitted a project application in September, <br /> 1982. CWCB staff met with District representatives, visited the <br /> project site, and discussed the project with them. The District <br /> decided to fund the required feasibility study with its own <br /> money. Colorado-Ute Electric Association, Inc . (Colorado-Ute) , <br /> performed the study. <br /> Proposed Project <br /> • <br /> The Stagecoach Reservoir would be created by the <br /> construction of a dam with a maximum height of 145 feet above <br /> streambed and a crest length of nearly 900 feet. . The reservoir <br /> would have a water surface area of approximately 780 acres at an <br /> elevation of 7,200 feet. The outlet works would be a gated, <br /> 66-inch diameter steel pipe tapering to 30-inches, thus allowing <br /> for the possible addition of a hydropower component to the <br /> project at a later date . <br /> The total cost of the project is presently estimated at <br /> $12,000,000. Additional analysis of dam designs, which will be <br /> necessary, could affect this estimate. <br /> The yield of the project is estimated at 30,000 acre-feet <br /> per year. However, it appears that there is presently a demand <br /> for only about 15,000 acre-feet per year . <br /> Colorado-Ute, in a letter agreement with the District to <br /> which the Board is not a party and which was entered into prior <br /> to the Board acting on the project, has indicated that it is <br /> willing to purchase 10,000, acre-feet per year at $35 per <br /> acre-foot . The agreement notes that : <br /> 119 <br /> st/c <br />
The URL can be used to link to this page
Your browser does not support the video tag.