Laserfiche WebLink
• • <br /> Project Summary— Denver Southeast Suburban Water & Sanitation District <br /> acting by and through its Water Activity Enterprise <br /> Contract No. C150411D <br /> SECTION 1 —BORROWER INFORMATION <br /> Name: Denver Southeast Suburban Water & Sanitation District <br /> acting by and through its Water Activity Enterprise <br /> Type of Entity: A Colorado Title 32 Special District formed pursuant to <br /> and governed by Title 32, Article 1, C.R.S. <br /> Address: PO Box 1660, Parker, Colorado, 80134 <br /> Contact: Heather Beasley, Manager <br /> Y� 9 <br /> Phone Number: 303-841-2797 <br /> E-mail address: hbeasley @pinerywater.com <br /> SECTION 2—PROJECT DESCRIPTION <br /> A. Description of PROJECT: This loan contract, to be used for the District's participation <br /> in the Water Infrastructure and Supply Efficiency Project (WISE) to reduce the <br /> District's dependence on non-renewable water sources,and specific to the DIA <br /> Connection is defined as the "PROJECT". The DIA Connection project component, a <br /> 24-inch 6 mile pipeline interconnection between Denver Water's treated distribution <br /> system near DIA and Aurora's Prairie Waters pipeline, will provide blend water <br /> deliveries for the WISE Authority members. Denver Water will own and operate the <br /> DIA Connection. The District's total participation cost is estimated to be $10,920,000. <br /> The CWCB approved a total loan amount not to exceed $9,926,280, for the District's <br /> participation cost of WISE, the loan amount for this contract, for the DIA Connection, <br /> is $454,500 which includes a one percent (1%) loan service fee of$4,500. <br /> B. Description of Feasibility Study: The CWCB has reviewed a feasibility study report <br /> dated October 23, 2013 on the PROJECT, titled "Water Infrastructure and Supply <br /> Efficiency Project Loan Feasibility Study,"which was prepared by Black &Veatch, on <br /> behalf of the WISE Authority. This study includes an alternative analysis, conceptual <br /> design descriptions, exhibits, cost estimates, and financial statements audited by L. <br /> Paul Goedecke, PC, and current financial information provided by Debra L. Sedgeley <br /> of CliftonLarsonAllen LLP. Additional clarification and information was provided by <br /> Eric Hecox and Rick Marsicek, P.E. of South Metro Water Supply Authority. Based <br /> upon the feasibility report, the CWCB determined the PROJECT to be technically and <br /> financially feasible. <br /> SECTION 3—CWCB's AUTHORITY <br /> Construction Fund: This loan is made pursuant to the provisions of §§ 37-60-119 <br /> and 37-60-120, C.R.S., which authorize the CWCB to loan money for water projects <br /> Appendix 1 to Loan Contract C150411D <br /> Page 1 of 4 <br />