My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-087 Contract
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
CT2015-087 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2014 12:30:27 PM
Creation date
11/25/2014 12:30:23 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-087
C150411D
Contractor Name
Denver Southeast Suburban Water and Sanitation District
Contract Type
Loan
Water District
8
County
Douglas
Arapahoe
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> BORROWER: DENVER SOUTHEAST SUBURBAN AGENCY NAME: COLORADO WATER <br /> WATER&SANITATION ACTING BY AND CONSERVATION BOARD/PDA <br /> THROUGH ITS WATER ACTIVITY ENTERPRISE CONTRACT TYPE: LOAN/PUBLIC <br /> CONTRACT No. C1504110 CWCB CMS#70933/CORE CT2015-087 <br /> PROJECT AMOUNT: 450.000 <br /> LOAN SERVICE FEE: $4,500 <br /> LOAN AMOUNT: $454,500 <br /> LOAN CONTRACT <br /> (STANDARD CONTRACT—WAIVER#160-APPROVED NOVEMBER 10,2003) <br /> THIS CONTRACT is made between the State of Colorado for the use and benefit of The Department of <br /> Natural Resources, Colorado Water Conservation Board ("CWCB" or "State"), and Denver Southeast <br /> Suburban Water & Sanitation District a Colorado Title 32 Special District, acting by and through its <br /> Water Activity Enterprise, ("BORROWER"or"DISTRICT"). <br /> FACTUAL RECITALS <br /> 1. Authority exists in the law, and funds have been budgeted, appropriated and otherwise made <br /> available and a sufficient unencumbered balance thereof remains available for encumbering and <br /> subsequent payment of this CONTRACT; and <br /> 2. Required approval, clearance, and coordination have been accomplished from and with appropriate <br /> agencies; and <br /> 3. For the purposes of this loan contract the District's participation, in the Water Infrastructure and <br /> Supply Efficiency Project (WISE) to reduce the District's dependence on non-renewable water <br /> sources, and specific to the DIA Connection is defined as the "PROJECT". The District's total <br /> participation cost is estimated to be $10,920,000. On May 22, 2014 the CWCB approved a total <br /> loan amount not to exceed $9,926,280, for the District's participation cost of WISE.The loan amount <br /> for this contract, for the DIA Connection, is $454,500 which includes a one percent (1%) loan <br /> service fee of$4,500 at an interest rate of 3.0% for 30 years; and <br /> 4. The PROJECT SUMMARY, attached as APPENDIX 1 and incorporated herein, contains BORROWER <br /> Information (Section 1), the PROJECT Description (Section 2), CWCB's authority for making this loan <br /> (Section 3), and CWCB Approval and Legislative Authorization (Section 4), identifying the amount <br /> of the loan and the terms of repayment. The PROJECT SUMMARY also contains sections on <br /> BORROWER'S debt, collateral, procedures and eligible expenses; and <br /> 5. The CWCB now desires, by this CONTRACT, to loan money to the BORROWER for this PROJECT upon <br /> mutually agreeable terms and conditions. <br /> THEREFORE, in consideration of the mutual and dependent covenants contained herein, the <br /> parties agree as follows: <br /> Loan Contract C150411D <br /> Page 1 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.