Laserfiche WebLink
Project Summary - Cottonwood Water and Sanitation District <br /> Acting by and Through its Cottonwood Water Enterprise <br /> Contract No. C150408D <br /> SECTION 1 —BORROWER INFORMATION <br /> Name: Cottonwood Water and Sanitation District acting by and <br /> through its Cottonwood Water Enterprise <br /> Type of Entity: The Cottonwood Water and Sanitation District is <br /> a Colorado Title 32 Special District formed pursuant to <br /> and governed by Title 32, Article 1, C.R.S. The <br /> Cottonwood Water Enterprise is operated and <br /> maintained pursuant to Article 45.1, Title 37, C.R.S. and <br /> was formed and is operated as an enterprise within the <br /> meaning of Colorado Const. Art. X, Section 20. <br /> Address: 2 Inverness Drive East, #200, Englewood, CO 80112 <br /> Contact: Patrick Mulhern, General Manager <br /> Phone Number: 303-649-9857 <br /> E-mail address: pat @mulhernmre.com <br /> SECTION 2-PROJECT DESCRIPTION <br /> A. Description of PROJECT: This loan contract, to be used for the District's <br /> participation in the Water Infrastructure and Supply Efficiency Project (WISE) <br /> to reduce the District's dependence on non-renewable water sources, and <br /> specific to the Phase 2 Infrastructure is defined as the "PROJECT". <br /> Components included in this phase include a pump station and pipeline from <br /> the BWPF to the existing ECCV pipeline, replacing the temporary <br /> interconnect with the Aurora distribution system and increasing the capacity <br /> of the overall system. Water will be pumped generally west to a high point, <br /> then west along the Highway E-470/C-470 corridor through the existing <br /> ECCV Western Pipeline. The District's total participation cost is estimated to <br /> be $4,960,000. The CWCB approved a total loan amount not to exceed <br /> $4,508,640, for the District's participation cost of WISE, the loan amount for <br /> this contract, for the Phase 2 Infrastructure, is $1,127,160 which includes a <br /> one percent (1%) loan service fee of$11,160. <br /> B. Description of Feasibility Study: The CWCB has reviewed a feasibility study <br /> report dated October 23, 2013 on the PROJECT, titled "Water Infrastructure and <br /> Supply Efficiency Project Loan Feasibility Study,"which was prepared by <br /> Black &Veatch, on behalf of the WISE Authority. This study includes an <br /> alternative analysis, conceptual design descriptions, exhibits, cost estimates, <br /> and financial statements audited by Haynie & Company, CPA. Additional <br /> clarification and information was provided by Eric Hecox and Rick Marsicek, <br /> P.E. of South Metro Water Supply Authority. Based upon the feasibility report, <br /> the CWCB determined the PROJECT to be technically and financially feasible. <br /> Appendix 1 to Loan Contract C150408D <br /> Page 1 of 4 <br />