My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 09/08/1983
CWCB
>
Board Meetings
>
DayForward
>
2001-3000
>
Board Meeting 09/08/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2014 3:58:16 PM
Creation date
11/21/2014 3:58:11 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/8/1983
Description
Minutes, Agenda, Memorandums September 08,09, 1983
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Grand Valley irrigation systems <br /> Initial Number <br /> capacity Length Acres of <br /> Irrigation systems (cfs) (miles) served laterals <br /> Government Highline Canal 1 ,675 54.0 25,900 1/108 <br /> Orchard Mesa- Power Canal!! 890 3.5 560 14 <br /> Grand Valley Power Plant 730 <br /> Orchard Mesa Pumping Plant <br /> Orchard Mesa Canal No. 1 90 16.3 4,120 91 <br /> Orchard Mesa Canal No. 2 70 17.3 2,710 70 <br /> Price Ditch 80 9.1 3,710 109 <br /> Stub Ditch 25 10.2 900 48 <br /> Subtotal 110.4 37,900 442 <br /> Grand Valley Canal 640 12.5 4,230 52 <br /> Mesa County Ditch 30 4.4 1,090 19 <br /> • Grand Valley Mainline Canal 160 14.0 7,760 60 <br /> Independent Ranchmen's Ditch 60 11 .8 2.310 35 <br /> Grand Valley Highline Canal 340 23.5 7,240 80 <br /> Kiefer Extension 160 15.4 5,970 37 <br /> Subtotal 81 .6 28,600 283 <br /> Redlands Power Canalg/ 850 2.5 400 <br /> Redlands Power and Pumping Plant <br /> Redlands Canal system 80 4,100 <br /> Subtotal 2.5 4,500 <br /> Small direct diversions 500 <br /> 1 Total 194.5 71 ,500 725 <br /> 1/ of the 108 laterals, 32 are private, and 76 are Federal <br /> 2/ The Orchard Mesa Power Canal and laterals have not been included in <br /> Stage Two investigations because the salt loading from this area is not <br /> significant and because most of the lateral system is already lined. <br /> 3/ The Redlands area has not been included in Stage Two investigations <br /> because it is not underlain by the Mancos Formation and because most of the <br /> irrigation system is already lined. <br /> • <br /> % <br />
The URL can be used to link to this page
Your browser does not support the video tag.