My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-169 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2015-169 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 3:12:00 PM
Creation date
11/21/2014 12:03:22 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-169
Contractor Name
West Reservoir and Ditch Company
Contract Type
Loan
Water District
40
County
Delta
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COLORADO West Reservoir And Ditch Outlet Repair Project Water <br /> CO CotoradotionB West Reservoir and Ditch Company <br /> Department or Natural Resources November 2014 Board Meeting <br /> L O A N D E T A I L S <br /> Project Cost: $ 471,577 ,0 Id <br /> CWCB Loan (with Service Fee): $248,378 .., -4 que <br /> Loan Term and Interest Rate: 30 Years @ 2% <br /> Funding Source: 4.: <br /> B O R R O W `E R E '�►.�r'� f 4.41 10,Agriculture Municipal Commercial �" <br /> 100% 0% 0% <br /> P R O J E C T D E T A TWIT <br /> Project Type: Outlet Rehabilitation �,. <br /> Average Annual Diversion: 604 AF O <br /> �1 J <br /> L 0 C A T I 0 N <br /> The West Reservoir and Ditch Company operates West County: Delta <br /> Reservoir No. 1, providing water seven miles eastward via Water Source: Jay Creek <br /> Wakefield Ditch to Wakefield Mesa. The water is Drainage Basin: Gunnison <br /> available for livestock as it traverses east Oak Mesa, and Division: 4 District: 40 <br /> irrigates approximately 600 acres of hay and pasture. The <br /> current landowners use the Oak Mesa Reservoir and Ditch water for spring irrigation, and, when those <br /> flows are exhausted, use the West Reservoir flows for mid summer to fall irrigation. The West <br /> Reservoir was improved in the early 1950s, but is now under a storage restriction order from the Office <br /> of the State Engineer due to deterioration of the outlet pipe. This project will include a low level <br /> outlet sized to meet SEO release requirements, an outlet stilling basin structure downstream of the <br /> dam for energy dissipation, and an intake structure fora manually-operated slide gate and trash racks. <br /> Construction is scheduled for Spring of 2015. <br /> West Reservoir <br /> No. 1 i <br /> - <br /> v"...,r a <br /> u.„k <br /> �` � � �� ux µ vim° �, ,'...,V-' h,., S North Fork <br /> ,. i Gunnison <br /> x,..f.$)4,t , <br /> Jr <br /> . „, . I., ,-, <br /> . River <br /> Paorna <br /> rr <br /> ...: ` a <br /> a* � r <br /> tf <br /> Water Project Loan Program - Project Data Sheet <br />
The URL can be used to link to this page
Your browser does not support the video tag.