Laserfiche WebLink
COLORADO t Emergency Supply Irrigating Ditch Repair Project <br /> co % Conservation Board Supply Irrigating Ditch Company <br /> November 2014 Board Meeting <br /> L O A N D T A I L S e __ ..bli <br /> Project Cost: $321,000 i W, <br /> CWCB Loan (with Service Fee): $324,210 a y� <br /> Loan Term and Interest Rate: 27 Years @ 2.25% ''„ I <br /> Funding Source: Severance Tax Perpetual Base Fund • <br /> B O R R O W E R— T Y P E .� , � I � <br /> Agriculture Municipal Commercial " <br /> 86% 0% Low - 5%Mid - 7% High 2% � <br /> P R O J E C T D E T A I L S <br /> Project Type: Ditch Rehabilitation <br /> Average Annual Diversion: 4,650 AF <br /> 1114ft 1.....111Mffia <br /> During the unprecedented flood of September 2013 in the L O C A T I O N <br /> tributaries to the South Platte River, a significant number County: Boulder <br /> of diversion structures and dams along the river corridor Water Source: Saint Vrain Creek <br /> were damaged including the Company's ditch system. Drainage Basin: South Platte <br /> Floodwaters destroyed the diversion dam, caused heavy Division: 1 District: 5 <br /> sedimentation in the ditch, and damaged 750 LF of ditch. <br /> Temporary repairs were completed in order to allow the Company to divert a portion of its water rights <br /> during the 2014 irrigation season. The Company has received approval of its Project Worksheet from <br /> FEMA to fund a portion of the permanent repairs. This loan will cover the remaining cost associated <br /> with the repairs and provide upfront funding for the FEMA reimbursement funds. Construction is <br /> scheduled to be complete prior to the 2015 irrigation season. <br /> HWY 287 <br /> Mead <br /> Lyons <br /> 1-25 <br /> HWY 66 <br /> +dPr Its <br /> Project Site (Longmont...) <br /> r <br /> s HWY 119 <br /> , <br /> a Table <br /> Z M,onta,n Aerzara <br /> Antanrww VeU.-Rcicyr <br /> Sttez c.: "� <br /> Niwot <br /> ma's: » "4 <br /> rem ., <br /> g ,. °.r .., <br /> Water Project Loan Program - Project Data Sheet <br />