My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150341 Increase 1 Approval letter
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150341 Increase 1 Approval letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 2:52:56 PM
Creation date
11/21/2014 12:01:40 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-027
C150341
Contractor Name
Pisgah Reservoir and Ditch Company
Contract Type
Loan
Water District
12
County
Teller
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DNR COLORADO 1313 Sherman Street John Hickenlooper,Governor <br /> Denver, CO 80203 <br /> CO 11. Colorado Water Mike King, DNR Executive Director <br /> Conservation Board P(303)866-3441 <br /> Department of Natural Resources F(303)866-4474 James Eklund, CWCB Director <br /> TO: Colorado Water Conservation Board Members <br /> FROM: Jonathan Hernandez, P.E., Project Manager <br /> Kirk Russell, P.E., Finance Section Chief V 0,-- <br /> November 19-20, 2014 Board Meeting (Updated on November 21, 2014) <br /> AGENDA ITEM: 28a - Change to Existing Loans <br /> Pisgah Reservoir and Ditch Company- Mount Pisgah Dam/Wrights Reservoir <br /> Outlet Works Rehabilitation Project <br /> Introduction <br /> The Pisgah Reservoir and Ditch Company (Company) received approval of a $161,345 CWCB loan <br /> (C150341) and a matching $161,345 WSRA grant (C150505) to finance the Mount Pisgah Dam/Wrights <br /> Reservoir Outlet Works Rehabilitation Project (Project) at the September 2012 CWCB Board Meeting. <br /> The purpose of the Project is to make improvements to the Pisgah Dam outlet works, per the State <br /> Engineer's Office (SEO) direction, to avoid a restriction order. The loan and grant together funded <br /> approximately 90% of the Project's estimated cost of $362,690. During final engineering, it was <br /> determined that the cost to rehabilitate the dam has increased and the current estimated cost is now <br /> $745,000. The Company is requesting a loan increase of $382,310 to fund these additional costs. See <br /> attached Project Data Sheet for a location map and Project summary. <br /> Staff Recommendation(Board Approved Staff Recommendation on November 20,2014) <br /> Staff recommends the Board approve a loan increase of $386,133 ($382,310 for Project costs and <br /> $3,823 for the 1% Loan Service Fee) for a total loan not to exceed $549,091 ($543,655 for Project cost <br /> and $5,437 for the 1% Loan Service Fee) to the Pisgah Reservoir and Ditch Company for engineering and <br /> construction costs related to the Mount Pisgah Dam/Wrights Reservoir Outlet Works Rehabilitation <br /> Project from the Construction Fund. The loan terms shall remain at 30 years at a blended interest rate <br /> of 1.75% per annum. Security for the loan shall be in compliance with CWCB Financial Policy#5. <br /> oF'Coto <br /> P <br /> Interstate Compact Compliance •Watershed Protection • Flood Planning a Mitigation • Stream a Lake Protection <br /> T6,Water Project Loans Et Grants •Water Modelin g • Conservation Et Drought Plannin g •Water Supply Planning <br /> I <br /> ''11876'' <br />
The URL can be used to link to this page
Your browser does not support the video tag.