My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2016-1007 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2016-1007 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2015 8:44:33 AM
Creation date
11/21/2014 11:59:55 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2016-1007
Contractor Name
Las Animas Consolidated Canal Comapny
Contract Type
Loan
County
Bent
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 DR COLORADO Repair €t Replacement of the Las Animas <br /> Co Conservation Board <br /> Consolidated Canal Spillway Structure <br /> Department of Nar.,raI Resources Las Animas Consolidated Canal Company <br /> November 2014 Board Meeting <br /> L O A N D E T A I L S -- <br /> Project Cost: $ 400,200 s l <br /> lit LoCWCB Loan (with Service Fee): $ 363,782 <br /> ► <br /> an Term and Interest Rate: 30 Years ® 5.05%Funding Source: <br /> B O R R O W E R T Y P E . L <br /> � <br /> Agriculture Municipal Commercial �" <br /> 23% 0% 77% <br /> P R O J E C T A I L S <br /> Project Type: Spillway Structure Replacement <br /> f, .O <br /> Average Annual Diversion: 26,000 AF <br /> L 0 C A T I O N <br /> The Las Animas Consolidated Canal Company and the County: Bent <br /> Consolidated Extension Canal Company were formed in Water Source: Arkansas River <br /> the mid-1870s and together have continuously operated Drainage Basin: Arkansas <br /> to irrigate 8,300 acres of land in the vicinity of Las Division: 2 District: 17 <br /> Animas, Colorado. A significant, localized thunderstorm <br /> occurred during the night in April 2014, which created heavy runoff which flowed into the canal <br /> downstream of the main canal headgate through several uncontrolled and ungaged tributaries. These <br /> flows exceeded the capacity of the existing spillway structure at the river return, caused the structure <br /> to be overtopped and undermined, and resulted in catastrophic failure of the existing structure. While <br /> temporary measures have been put in place to keep the ditch in operation, a long-term solution is <br /> being sought. The Company is seeking to replace the spillway structure with an improved and <br /> modernized structure similar to the original design, but with additional control and safety measures to <br /> allow automated canal operations, including response to similar flooding conditions in the future. <br /> Modernization of this structure will improve routine canal operations and safety, in addition to <br /> mitigating future canal failure risk. <br /> m a -4.. c <br /> CD <br /> ids <br /> ,7911 1,: C <br /> Arkansas w A,�..aaiA Las Animas <br /> River <br /> e c 0 oh. > <br /> i ^� 6,St Lis Ammas 1 <br /> _ g .... a ins a' <br /> N U w u ff$ <br /> S <br /> C3 <br /> Spillway <br /> Structure <br /> Water Project Loan Program - Project Data Sheet <br />
The URL can be used to link to this page
Your browser does not support the video tag.