My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Platte River Recovery Implementation Partnership Related Brochures and Maps
CWCB
>
Water Supply Protection
>
DayForward
>
7001-8000
>
Platte River Recovery Implementation Partnership Related Brochures and Maps
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2015 3:48:33 PM
Creation date
11/19/2014 3:57:08 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Related to the Platte River Endangered Species Partnership (aka Platte River Cooperative Agreement [CA]; aka Platte River Recovery Implementation Program [PRRIP]1997 to 2014
State
CO
NE
WY
Basin
South Platte
North Platte
Water Division
1
Author
Various
Title
Various Platte River Recovery Implementation Program related Brochurs and Maps
Water Supply Pro - Doc Type
Map
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
soil cement protection to prevent erosion ers will be improved to facilitate local traffic. <br /> and the bottom will be lined with compacted Both reservoirs will fluctuate between dead <br /> clay. A system of drains will also be installed pool (water below the level of the outlet <br /> to minimize and regulate any seepage. Wa- <br /> structures) and full pool, depending upon the <br /> ter will be delivered through inlets from the availability of excess water. During the irriga- <br /> Phelps Canal and released through outlet lion season,the west reservoir will be re <br /> gates directly to the Platte River. <br /> 1 served to help regulate irrigation flows in the <br /> A three-mile stretch of the Phelps Canal will Phelps Canal, resulting in more moderate <br /> 4 be rehabilitated to accommodate higher fluctuations in the water level during these <br /> flows into the reservoirs. Some roads in the months. Water entering the reservoirs will <br /> area will be removed or rerouted, while oth- be held for a period ranging from days to <br /> J-2 Return Flow to the Platte River under Current and <br /> Future Hydropower Generation Operations <br /> 2500 <br /> w <br /> U 2000 <br /> CU <br /> i: r 1 <br /> , r— /v- <br /> 0 1500 <br /> ro <br /> a <br /> 4! 1000 <br /> 0 <br /> 1 <br /> 1 3 1 <br /> o 500 <br /> o <br /> V U U U U U U U U U U <br /> aJ au a a v a) a, a) a) V a <br /> Q q Q Q Q 2 2 Q Q Q <br /> r!,r■ I <br /> d- try 00 O` O A ,M <br /> Without Regulation —With Regulation <br />
The URL can be used to link to this page
Your browser does not support the video tag.