Laserfiche WebLink
soil cement protection to prevent erosion ers will be improved to facilitate local traffic. <br /> and the bottom will be lined with compacted Both reservoirs will fluctuate between dead <br /> clay. A system of drains will also be installed pool (water below the level of the outlet <br /> to minimize and regulate any seepage. Wa- <br /> structures) and full pool, depending upon the <br /> ter will be delivered through inlets from the availability of excess water. During the irriga- <br /> Phelps Canal and released through outlet lion season,the west reservoir will be re <br /> gates directly to the Platte River. <br /> 1 served to help regulate irrigation flows in the <br /> A three-mile stretch of the Phelps Canal will Phelps Canal, resulting in more moderate <br /> 4 be rehabilitated to accommodate higher fluctuations in the water level during these <br /> flows into the reservoirs. Some roads in the months. Water entering the reservoirs will <br /> area will be removed or rerouted, while oth- be held for a period ranging from days to <br /> J-2 Return Flow to the Platte River under Current and <br /> Future Hydropower Generation Operations <br /> 2500 <br /> w <br /> U 2000 <br /> CU <br /> i: r 1 <br /> , r— /v- <br /> 0 1500 <br /> ro <br /> a <br /> 4! 1000 <br /> 0 <br /> 1 <br /> 1 3 1 <br /> o 500 <br /> o <br /> V U U U U U U U U U U <br /> aJ au a a v a) a, a) a) V a <br /> Q q Q Q Q 2 2 Q Q Q <br /> r!,r■ I <br /> d- try 00 O` O A ,M <br /> Without Regulation —With Regulation <br />