My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150319 PIF Doccuments
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
C150319 PIF Doccuments
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2014 4:01:02 PM
Creation date
11/19/2014 11:18:29 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150319
CT2015-043
Contractor Name
Fisher Ditch Company
Contract Type
Loan
County
Morgan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. • • <br /> Project Summary — Fisher Ditch Company — Contract No. C150319 <br /> SECTION 1 —BORROWER INFORMATION <br /> Name: Fisher Ditch Company <br /> Address: 1800 Larimer Street, Suite I 30 qgr ✓ , ',s 0202 <br /> Contact: Richard Belt, President <br /> Phone Number: 303-294-2198 <br /> I <br /> E-mail address: Richard.l.belt @xcelenergy.com <br /> Type of Entity: a Colorado nonprofit corporation <br /> Section 2 — Project Description <br /> A. Description of PROJECT: The BORROWER applied to the CWCB for a loan to be <br /> used for the construction of the Ditch Infrastructure Improvements Project, located <br /> in Denver County, hereinafter referred to as the PROJECT, at an estimated total <br /> cost of$500,000. <br /> B. Description of Feasibility Study: The CWCB has reviewed a feasibility study report <br /> on the PROJECT entitled "Feasibility Study — Fisher Ditch Various Infrastructure <br /> Improvements", dated June 2011, compiled by Richard Belt, P.E., Amy Willhite, <br /> Larry Fiore and Gene Brienza, which is incorporated herein by reference, and, <br /> based upon the feasibility report, the CWCB determined the PROJECT to be <br /> technically and financially feasible. <br /> SECTION 3—CWCB's AUTHORITY <br /> Construction Fund: This loan is made pursuant to the provisions of§§ 37-60-119 and <br /> 37-60-120, C.R.S., which authorize the CWCB to loan money for water projects from <br /> the CWCB Construction Fund for the benefit of the people of the state, provided that <br /> the borrower assures repayment of that money. <br /> Small Project Loan:This loan is made pursuant to the provisions of§§ 37-60-119 and <br /> 37-60-120, C.R.S., which authorizes the CWCB to loan money for water projects for the <br /> benefit of the people of the State, provided that the borrower assures repayment of that <br /> money. <br /> Section 37-60-122(1)(b) C.R.S., authorizes the CWCB to make loans of up to <br /> $10,000,000 from the CWCB's Construction Fund and the State Severance Tax Trust <br /> Fund Perpetual Base Account Fund without prior approval from the General <br /> Assembly. <br /> SECTION 4-BOARD APPROVAL <br /> At its July 2011 meeting, the CWCB approved a Small Project Loan from the Construction <br /> Fund to the BORROWER in an amount up to $454,500 for PROJECT costs, not to exceed 90% <br /> of the cost of the PROJECT, with a loan origination fee of 1% in accordance with CWCB <br /> Policy No. 16, at an interest rate of 5.95% per annum for a repayment term of 30 years. <br /> SECTION 5—SCHEDULE OF EXISTING DEBT <br /> Appendix 1 to Loan Contract C150319 <br /> Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.