My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chronological Index of the ARCA Minutes of Meetings 05/31, 07/22/1949
CWCB
>
Water Supply Protection
>
DayForward
>
7001-8000
>
Chronological Index of the ARCA Minutes of Meetings 05/31, 07/22/1949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2014 4:09:19 PM
Creation date
11/18/2014 1:17:32 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Chronological Index of the Arkansas River Compact Administration Minutes of Meetings May 31, 1949, July 22,1949 Lamar, Co.
State
CO
Basin
Arkansas
Title
Chronological Index of the Arkansas River Compact Administration Minutes of Meetings May 31, 1949, July 22,1949 Lamar, Co.
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Budget 77-79 <br /> Pueblo flood storage and releases Appendix A <br /> Letter to ARCA from Division Engineer re <br /> Event of August 1, 1976 <br /> • Minutes from meeting in Pueblo in September, 1976 <br /> Hydrographs <br /> USGS Flood Routing Study of Arkansas River: preliminary <br /> study proposal. ...... . . .. .. . . . . .. .. .. . . .. ,Appendix B <br /> March 22, 1977: Lamar, Colorado <br /> Engineering Committee: Amity storage in JMR <br /> Transit losses, Las Animas to JMR.. . .. .. ... ..... 3-9,19-24 <br /> Evaporation losses from JMR 9-11,16-20 <br /> Amity's storage volume: method of calculation. . . 12-14 <br /> Effects of winter storage on river regime 15 <br /> USGS transit loss study .25-31 <br /> Pueblo winter storage: historic use of the water. . ... ... . .. .. . ..33-37 <br /> Effects on Great Plains Reservoirs system 40-42 <br /> Stateline flows 43-52 <br /> JMR operations: release of Amity water 52-53 <br /> Trinidad: objections to project by downstream water users 56-58 <br /> April 23, 1-977 Trinidad-,--Colorado <br /> Agenda 1-2 <br /> Pueblo Reservoir: USGS flood routing studies: <br /> USGS studies in vicinity 4-5,11 <br /> Purposes of study 8-10 <br /> Funding for study 12-15 <br /> Motion: accept study as revised 15 <br /> JMR: Amity storage program - 15-22 <br /> Evaporation and transit losses 16-21 <br /> Motion: accept engineering report - 21-22 <br /> Trinidad Reservoir 22-40 <br /> Purgatoire Water Conservation District presentation22-27 <br /> Physical characteristics of dam.. 28 <br /> Lawsuit: David Robbin's view on issues........ . . . 29-32 <br /> Flood water operations 36-39 <br /> JMR storage. .. 41-50 <br /> Concerns of Water District 67 Ditches 41-45 <br /> Effects of Pueblo Dam. , . 45-49 <br /> Motion: Corps to look at 5,000 cfs limit on <br /> Pueblo flood releases, 49-50 <br /> Operations committee: JMR storage status report. 50-53 <br /> Problems concerning storage in JMR: memo to ARCA Appendix A <br /> Attendance, Trip to Trinidad Reservoir Appendix B <br /> 2 <br /> 2 a <br />
The URL can be used to link to this page
Your browser does not support the video tag.