My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chronological Index of the ARCA Minutes of Meetings 05/31, 07/22/1949
CWCB
>
Water Supply Protection
>
DayForward
>
7001-8000
>
Chronological Index of the ARCA Minutes of Meetings 05/31, 07/22/1949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2014 4:09:19 PM
Creation date
11/18/2014 1:17:32 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Chronological Index of the Arkansas River Compact Administration Minutes of Meetings May 31, 1949, July 22,1949 Lamar, Co.
State
CO
Basin
Arkansas
Title
Chronological Index of the Arkansas River Compact Administration Minutes of Meetings May 31, 1949, July 22,1949 Lamar, Co.
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,cember 9, 1975: Lamar, Colorado <br /> •tendance .1 <br /> Approval of minutes...._... . ... . ., . . . .•2 <br /> Operations committee report. .2-3 <br /> Minutes of telephonic meeting of April 9, 1975.. . ... . . . . . . ...... ..3-4 <br /> Auditor's report 4 <br /> Election of officers .. ., ,,,R,.4 <br /> Budget for 1977-78 . .. .5-6 <br /> Compact gaging stations: discussion of radio equipment 6 <br /> JMR permanent pool:status 7 <br /> Special engineering committee to study proposed pool ? <br /> Pueblo Dam: discussion on winter storage. 7-8 <br /> Motion: special engineering committee to review <br /> operations of Fry-Ark Project at end of each Compact <br /> year and to report at each annual meeting..... ... . ..... ..8 <br /> Beginning with the May 5, 1976, meeting, the minutes have been replaced <br /> by a transcript. [Ruth Yeager] <br /> May 5, 1976: Garden City, Kansas <br /> Special Meeting on JMR Permanent Pool <br /> Purpose of meeting: JMR permanent pool considerations ....4 <br /> eblo Reservoir: winter storage program.. .. .. .. .. . ... ... .. .. ...5-29 <br /> Statement by Southeast Colorado Water <br /> Conservation District representative. .... .. .. . . ..5-8 <br /> Division Engineer's statement 9-12 <br /> Discussion: effects on JMR 12-16 <br /> Informal motion: ask USGS to study the effects of the <br /> winter storage program on JMR storage 16-17 <br /> Discussion: Fort Lyon Ditch diversions 18-22 <br /> Efficiency of Great Plains reservoirs 22-24 <br /> Transmission losses................ ... ... . .... .. 24-29 <br /> JMR permanent pool: <br /> Muddy Creek water rights.30-33,47-52,70-71,79-88,98-99,103 <br /> Operating criteria. .. . ... . ... 32-112 <br /> Location of pool ..35-39 <br /> Size of pool,.. 36-47 <br /> Evaporation loss 40-42,47,49,53-54 <br /> Gaging of pool to determine total storage... .56-62,66-68 <br /> Releases when conservation pool is empty..,... .....70-72 <br /> Manvel Canal water. .. .. .... . 104-111 <br /> Possible ownership of water in JMR.. 113-120 <br /> Motion: Engineering committee to make a study <br /> of benefits to river system of such ownership..119-120 <br /> Transit loss studies. ... .. ,. .. ..... .125-129 <br />
The URL can be used to link to this page
Your browser does not support the video tag.