Laserfiche WebLink
f <br /> m <br /> v <br /> 1$ <br /> 0 <br /> n <br /> m <br /> 0 <br /> D i <br /> our information. <br /> YR. MENDENHALL: There have been no subsequent develop- Z' <br /> o ente, other than the gates were closed at midnight on the o <br /> night of the alst of October. Reoontly, the water users in <br /> 7ietriot 87, under the clause in our interim agreement per- <br /> mitting them to call for river flow not exceeding a maximum <br /> of 100 feet, are using 75 feet at the present time, or were <br /> at the time I left home. <br /> no `There are no further developments. <br /> (Discussion off the record. ) <br />• <br /> MI . �MENDE NHALL: At a meeting held on November 10---was <br /> m <br /> that the date? <br /> on <br /> CHAIRI AN K"Rk ER: Yea. <br /> i <br /> Mg. ME iDEt4HALL: --November 10 at Lamar, General Kramer, <br /> so <br /> Commissioners Knapp, Patterson, Leavitt, and myself, went to <br /> r!' ft <br />, z, the dam. All the gates were in place. The seals were ready <br /> It to install. Resident Engineer Gilbert was kind enough to <br /> call at the meeting place of the Commissioners in Lamar, and <br />•yy]� informed us that delivery of the electrical appliances had <br /> tb been promised in the month of January, but, however, these <br /> would not preclude the possibility of impounding waters in <br /> Lvov the future in Caddoa, and they had mechanical means of raising <br /> the gates before they arrived with their electrical equipment. <br /> I believe that is all. <br /> CHAIRMAN Y,i <+ tt Mr. Gilbert was very reassuring that <br /> whether the electrical installation was completed or not, <br />