My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-101 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
CT2015-101 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2014 1:44:55 PM
Creation date
11/17/2014 3:13:16 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-101
Contractor Name
Upper Platte and Beaver Canal Company
Contract Type
Loan
Water District
1
County
Morgan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6 OPINION OF FEASIBILITY <br /> There do not appear to be significant roadblocks that would keep UP&B from successfully <br /> completing this project. Based on our preliminary analysis,we believe that the proposed <br /> recharge pond and bridge expansion are feasible and reasonable. The benefits of these projects <br /> are that UP&B shareholders can pump needed water from their irrigation wells and operation and <br /> maintenance of the canal will be effective and efficient. <br />
The URL can be used to link to this page
Your browser does not support the video tag.