My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
San Juan River/Delores Division 7 Durango RICD 06CW09 Report on Design, Functionality
CWCB
>
Water Supply Protection
>
DayForward
>
7001-8000
>
San Juan River/Delores Division 7 Durango RICD 06CW09 Report on Design, Functionality
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2015 3:48:31 PM
Creation date
11/10/2014 10:06:35 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
06CW09
Description
Report on the Design, Functionality, and Physical Characteristics of the Durango Boating Park as it Relates to the RICD Application
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
2/15/2006
Author
Recreation Engineering and Planning 485 Arapahoe Ave Boulder, CO 80302 Gary M. Lacy, P.E.
Title
Report on the Design, Functionality, and Physical Characteristics of the Durango Boating Park as it Relates to the RICD Application
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Figure 10. A U- structure ( "D" -hole) at the Yampa River boating Park at 76 cfs. <br />Higher Flows <br />The high flow channels are designed to accommodate higher flows during <br />the spring and summer run -off. These channels have been shown to capture, <br />control, and divert flows throughout the gamut of design levels. <br />Figure 11. The U- structure at Charlie's Hole in Steamboat shown at 1850 cfs. <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.