My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colorado River Division 5 Gore Canyon Water Activity Summary Agenda Item 25.d
CWCB
>
Water Supply Protection
>
DayForward
>
7001-8000
>
Colorado River Division 5 Gore Canyon Water Activity Summary Agenda Item 25.d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2014 4:08:40 PM
Creation date
11/6/2014 2:10:58 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Water Supply Reserve Account-Grant Grand County Gore Canyon RICD
State
CO
Basin
Colorado Mainstem
Water Division
5
Author
CWCB Staff
Title
Water Supply Reserve Account-Grant and Loan Program Water Activity Summary Sheet Agenda 25.d
Water Supply Pro - Doc Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
All products, data and information developed as a result of this grant must be provided to the CWCB <br /> in hard copy and electronic format as part of the project documentation. This information will in turn <br /> be made widely available to Basin Roundtables and the general public and will help promote the <br /> development of a common technical platform. <br /> In accordance with the revised WSRA Criteria and Guidelines, Staff would like to highlight <br /> additional reporting and final deliverable requirements. The specific requirements are provided <br /> below. <br /> Reporting: The applicant shall provide the CWCB a progress report every 6 months, <br /> beginning from the date of the executed contract. The progress report shall describe the <br /> completion or partial completion of the tasks identified in the scope of work including a <br /> description of any major issues that have occurred and any corrective action taken to address <br /> these issues. <br /> Final Deliverable: At completion of the project, the applicant shall provide the CWCB a <br /> final report that summarizes the project and documents how the project was completed. This <br /> report may contain photographs, summaries of meetings and engineering reports/designs. <br /> Engineering: All engineering work(as defined in the Engineers Practice Act(§12-25- <br /> 102(10) C.R.S.))performed under this grant shall be performed by or under the responsible <br /> charge of professional engineer licensed by the State of Colorado to practice Engineering. <br /> • <br /> - 4 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.