My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-109 Contract
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
CT2015-109 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2014 11:28:56 AM
Creation date
10/28/2014 3:15:39 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-109
Contractor Name
Parker Water and Sanitation District
Contract Type
Loan
Water District
8
County
Douglas
Arapahoe
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Summary — Parker Water and Sanitation District <br /> Acting by and Through its Water Activity Enterprise <br /> Contract No. CI50410C <br /> SECTION 1 —BORROWER INFORMATION <br /> Name: Parker Water and Sanitation District acting by and <br /> through its Water Activity Enterprise <br /> Type of Entity: The Parker Water and Sanitation District is <br /> a Colorado Title 32 Special District formed pursuant to <br /> and governed by Title 32, Article 1, C.R.S. <br /> Address: 19801 East Main Street, Parker, CO 80138 <br /> Contact: Ron Redd, District Manager <br /> Phone Number: 303-841-4627 <br /> E-mail address: rredd @pwsd.org <br /> SECTION 2—PROJECT DESCRIPTION <br /> A. Description of PROJECT: This loan contract, to be used for the District's <br /> participation in the Water Infrastructure and Supply Efficiency Project (WISE) <br /> to reduce the District's dependence on non-renewable water sources, and <br /> specific to the Phase 2 Infrastructure is defined as the "PROJECT". <br /> Components included in this phase include a pump station and pipeline from <br /> the BWPF to the existing ECCV pipeline, replacing the temporary <br /> interconnect with the Aurora distribution system and increasing the capacity <br /> of the overall system. Water will be pumped generally west to a high point, <br /> then west along the Highway E-470/C-470 corridor through the existing <br /> ECCV Western Pipeline. The District's total participation cost is estimated to <br /> be $17,310,000. The CWCB approved a total loan amount not to exceed <br /> $15,734,790, for the District's participation cost of WISE. The loan amount for <br /> this contract, for the Phase 2 Infrastructure is $3,418,658 which includes a one <br /> percent(1%) loan service fee of$33,848. <br /> B. Description of Feasibility Study: The CWCB has reviewed a feasibility study <br /> report dated October 23, 2013 on the PROJECT, titled "Water Infrastructure and <br /> Supply Efficiency Project Loan Feasibility Study,"which was prepared by <br /> Black &Veatch, on behalf of the WISE Authority. This study includes an <br /> alternative analysis, conceptual design descriptions, exhibits, cost estimates, <br /> and financial statements audited by Clifton Gunderson LLP. Additional <br /> clarification and information was provided by Eric Hecox and Rick Marsicek, <br /> P.E. of South Metro Water Supply Authority. Based upon the feasibility report, <br /> the CWCB determined the PROJECT to be technically and financially feasible. <br /> Appendix 1 to Loan Contract Cl 50410C <br /> Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.