My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colorado River Division 5 Breckenridge RICD 00CW2810 06/20/2008
CWCB
>
Water Supply Protection
>
DayForward
>
7001-8000
>
Colorado River Division 5 Breckenridge RICD 00CW2810 06/20/2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2014 3:36:16 PM
Creation date
10/27/2014 3:20:48 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Breckenridge RICD 00CW28101 Case # 08CW73 (00CW281) application to make Conditional Rights Absolute and for Finding of Reasonable Diligence
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
6/20/2008
Author
Porzak Browning & Bushong LLP Glenn E. Porzak (#2793) Katherine A.D. Ryan (#38873)
Title
Breckenridge RICD 00CW28101 Case # 08CW73 (00CW281) application to make Conditional Rights Absolute and for Finding of Reasonable Diligence
Water Supply Pro - Doc Type
Court Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. <br /> 3. Description of Decreed Conditional Water Rights: <br /> A. Date of Original Decree: June 5, 2002, 00CW281, District Court,Water Division <br /> 5. <br /> B. Legal Description of Structures: The Park stretches approximately 1800 feet <br /> within the channel of the Blue River in the Town of Breckenridge. The Park was <br /> built in two phases. The location of the structures in"Phase I" and"Phase II"of <br /> the Park are described below. <br /> 1. Phase I: Each of the structures that comprise Phase I are located in the NW1/4 <br /> SW1/4 and SW1/4 SW1/4 of Section 30, T. 6 S.,R. 77 W., the 6th P.M., and are <br /> more specifically described as follows: <br /> Structure 1. A "U"shaped structure in the channel of the Blue River at a <br /> point approximately 1,240 feet from the west line and 1,000 <br /> feet from the south line of said Section 30. <br /> Structure 2. A"V"shaped structure in the channel of the Blue River at a <br /> point approximately 1,190 feet from the west line and 1,090 <br /> feet from the south line of said Section 30. <br /> Structure 3. Two opposing rock deflector structures on either side of the <br /> channel of the Blue River located approximately 1,160 feet <br /> from the west line and 1,230 feet from the south line of said <br /> Section 30. <br /> Structure 4. Two opposing rock deflector structures on either side of the <br /> channel of the Blue River located approximately 1,130 feet <br /> from the west line and 1,310 feet from the south line of said <br /> Section 30. <br /> Structure 5. A"U" shaped structure in the channel of the Blue River at a <br /> point approximately 1,110 feet from the west line and 1,400 <br /> feet from the south line of said Section 30. <br /> Structure 6. Two opposing rock deflector structures on either side of the <br /> channel of the Blue River located approximately 1,120 feet <br /> from the west line and 1,530 feet from the south line of said <br /> Section 30. <br /> Structure 7. Two offset"V"structures on either side of the channel of the <br /> Blue River located approximately 1,120 feet from the west line <br /> and 1,560 feet from the south line of said Section 30. <br /> 23369 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.