My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colorado River Division 5 Breckenridge RICD 00CW2810 06/25/2008
CWCB
>
Water Supply Protection
>
DayForward
>
7001-8000
>
Colorado River Division 5 Breckenridge RICD 00CW2810 06/25/2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2014 3:20:48 PM
Creation date
10/27/2014 3:20:46 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Breckenridge RICD 00CW28101 Case # 08CW73 (00CW281) Ruling of the Referee and Decree of the Water Court
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
6/25/2008
Author
Porzak Browning & Bushong LLP Glenn E. Porzak (#2793) Katherine A.D. Ryan (#38873)
Title
Breckenridge RICD 00CW28101 Case # 08CW73 (00CW281) Ruling of the Referee and Decree of the Water Court
Water Supply Pro - Doc Type
Court Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. Stipulation. The CWCB stipulated to the entry of a proposed decree with <br /> Breckenridge on _, 2009. The CWCB has consented to entry of this Decree. The Court <br /> hereby approves of the foregoing stipulation. <br /> 5. Summary of Application. The Court granted absolute and conditional water <br /> rights to the Town of Breckenridge in Water Court Case No. 00CW281. By the subject <br /> Application, the Town of Breckenridge seeks to make absolute a portion of the water rights <br /> decreed in Case No. 00CW281, and a finding of reasonable diligence on all other water rights <br /> decreed therein. The subject water rights are described as follows: <br /> A. Name of Structures: Town of Breckenridge Whitewater Park(the "Park"). <br /> B. Description of Decreed Conditional Water Rights: <br /> (1) Date of Original Decree: June 5, 2002, 00CW281, District Court, Water Division <br /> 5. <br /> (2) Legal Description of Structures: The Park stretches approximately 1800 feet <br /> within the channel of the Blue River in the Town of Breckenridge. The Park was <br /> built in two phases. The location of the structures in"Phase I"and"Phase II" of <br /> the Park are described below. <br /> i. Phase I: Each of the structures that comprise Phase I is located in the NW1/4 <br /> SW1/4 and SW1/4 SW1/4 of Section 30, T. 6 S., R. 77 W.,the 6th P.M., and are <br /> more specifically described as follows: <br /> Structure 1. A"U" shaped structure in the channel of the Blue River at a <br /> point approximately 1,240 feet from the west line and 1,000 <br /> feet from the south line of said Section 30. <br /> Structure 2. A"V" shaped structure in the channel of the Blue River at a <br /> point approximately 1,190 feet from the west line and 1,090 <br /> feet from the south line of said Section 30. <br /> Structure 3. Two opposing rock deflector structures on either side of the <br /> channel of the Blue River located approximately 1,160 feet <br /> from the west line and 1,230 feet from the south line of said <br /> Section 30. <br /> Structure 4. Two opposing rock deflector structures on either side of the <br /> channel of the Blue River located approximately 1,130 feet <br /> from the west line and 1,310 feet from the south line of said <br /> Section 30. <br /> 25523 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.