My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colorado River Division 5 Palisades Whitewater Park Correspondence
CWCB
>
Water Supply Protection
>
DayForward
>
7001-8000
>
Colorado River Division 5 Palisades Whitewater Park Correspondence
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2014 4:03:10 PM
Creation date
10/27/2014 11:54:55 AM
Metadata
Fields
Template:
Water Supply Protection
Description
Colorado Division 5, Palisades Whitewater Park Correspondence
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/2007
Author
Various
Title
Palisades Whitewater Park
Water Supply Pro - Doc Type
Correspondence
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10/23/2007 12: 25 FAX 9702456933 USF"S GRANO JUNCTION CO 21002/010 <br /> DEPARTMENT OF THE ARMY PERMIT EVALUATION <br /> AND DECISION DOCUMENT <br /> Applicant: <br /> Department of Army Number: SPK-#########-XX <br /> This document constitutes my Environmental Assessment, Statement of Findings, and review <br /> and compliance determination according to the Section 404(b)(1) guidelines for the proposed <br /> work(applicant's preferred alternative) described in the public notice issued by the Sacramento <br /> District. <br /> I. Proposed Project: <br /> A. Changes to the proposed project since circulation of the public notice: <br /> B. Specific activity that requires a Department of the Army permit: <br /> II. Environmental and Public Interest Factors Considered: <br /> A. Purpose and need: <br /> B. Alternatives [33 CFR 320.4(b)(4),40 CFR 230.10] <br /> 1. No action/no permit issued: <br /> 2. Other project designs (smaller, larger, different, etc.): <br /> • <br /> 3. Other sites: <br /> C. Physical/chemical characteristics and anticipated changes (check applicable <br /> blocks and provide concise description of impacts for the proposed project, other evaluated <br /> alternatives, and the no action). <br /> U Substrate: <br />
The URL can be used to link to this page
Your browser does not support the video tag.