My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pagosa Springs San Juan/Delores River Division 7 Correspondence
CWCB
>
Water Supply Protection
>
DayForward
>
7001-8000
>
Pagosa Springs San Juan/Delores River Division 7 Correspondence
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2014 11:55:21 AM
Creation date
10/27/2014 11:54:49 AM
Metadata
Fields
Template:
Water Supply Protection
Description
Miscellaneous Correspondence
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
1/1/2005
Author
Various
Title
Pagosa Springs WWP, San Juan/Delores Division 7 Correspondence
Water Supply Pro - Doc Type
Correspondence
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0811512005 15:47 9702599944 DIV 7 WATER RESOURCE PAGE 02 <br /> 4 <br /> STATE OF COLORADO <br /> WATER DIVISION 7 <br /> DIVISION OF WATER RESOURCES <br /> Office of.the State Engineer ; ° e <br /> Department of Natural Resources "1876 <br /> 701 Camino Del Rio,Suite 205 Bill Owens <br /> . Durango,CO 81301 Governor <br /> Phone:(970)247-1845 Russell George <br /> FAX: (970)259-0944. Executive Director <br /> ttp://water.stat0.co.us! Hui Simpson,P.B. <br /> h0p://water.state.co.usl Engineer <br /> Kenneth Becgles,P.E. <br /> Division Engineer <br /> August 15,2005 <br /> Department of the Army <br /> US Army Engineer District Sacramento <br /> Corps of Engineers <br /> 1325 J Street <br /> Sacramento, CA 95814-2922 <br /> Re: Public Notice 200575106 <br /> Dear Ms. Hellige: <br /> Our Denver office commented previously on this project and we agree that in <br /> general there are no water rights impacts by the project that we are aware of. <br /> The purpose of this comment is to express our concern about the reenlargement of <br /> the channel which could raise the gradient of the stream. This could cause flooding or <br /> inundation of water rights structures adjacent to the river.This includes the benchmark <br /> gaging station which has been taken out and replaced upstream. The last historic record <br /> due to the changed control section has had an impact on our ability to monitor flows in <br /> Pagosa Springs. <br /> We question whether there is an improvement to the fishery as a result if this <br /> work. The previous river work done by David Rosgen was directed to impact this fishery <br /> aspect. These channel improvements were removed under this and rock was laid against <br /> one bank which would cause more water to shift to the east side. <br /> The history of low head hydro dams has a background of creating dangerous <br /> backwater eddy's which are very dangerous for users. We see that pools with backwater <br /> current flows have been created at the cutoff wall which was cemented into place,we <br /> believe. <br /> We do not draw other conclusions but believe that the Corps should take these <br /> comments into consideration before approving the permit. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.