Laserfiche WebLink
• consumptive use factor from the table shall be deliverable less any <br /> amounts deducted by the Division Engineer for evaporation and <br /> transit loss. That portion identifiable as canal and lateral loss is to <br /> be dedicated to use of other water users within the ditch service <br /> area. The remaining tail-water and deep percolation components <br /> shall be released to the river by the Division Engineer to maintain <br /> historic return flow patterns within the succeeding 12 months. <br /> Canal and Tail Deep Total Consumptive <br /> Return <br /> Ditch Lateral Loss + Water + Percolation = Flows Use Factor <br /> Bessemer 0.1348 0.0523 0.2212 0.4084 0.5916 <br /> Rocky Ford Highline 0.2313 0.0427 0.1536 0.4275 0.5725 <br /> Oxford 0.0916 0.0566 0.3644 0.5126 0.4874 <br /> Catlin 0.1113 0.0547 0.3431 0.5091 0.4909 <br /> Holbrook 0.1208 0.0537 0.2102 0.3848 0.6152 <br /> Fort Lyon 0.2783 0.0380 0.1307 0.4469 0.5531 <br /> Las Animas Consldtd. 0.0967 0.0561 0.2550 0.4079 0.5921 <br /> Keesee 0.0662 0.0592 0.2223 0.3477 0.6523 <br /> Fort Bent 0.1208 0.0537 0.2102 0.3848 0.6152 <br /> Amity 0.2389 0.0419 0.1442 0.4250 0.5750 <br /> Lamar 0.1068 0.0551 0.3459 0.5079 0.4921 <br /> • Hyde 0.0662 0.0592 0.2036 0.3290 0.6710 <br /> Manvel 0.1068 0.0551 0.3459 0.5079 0.4921 <br /> X-Y Graham 0.0916 0.0566 0.1949 0.3431 0.6569 <br /> Buffalo 0.1018 0.0556 0.2177 0.3751 0.6249 <br /> Sisson-Stubbs 0.0611 0.0597 0.2054 0.3262 0.6738 <br /> B. The State and Division Engineers shall apply these presumptive <br /> factors in approving and developing terms and conditions for <br /> proposed leases, loans, options and exchanges of water from the <br /> above ditch systems through the water bank in their determinations <br /> as set forth in Rule 7 for bank users within these systems. To claim <br /> values differing from those listed above, users must submit to the <br /> State and Division Engineers a historic consumptive use analysis <br /> for consideration. <br /> C. For water outside of the systems listed above, a historic <br /> consumptive use analysis must be submitted to the State and/or <br /> Division Engineers for consideration. <br /> Rule 9. Procedures for Delivering Water from Storage Facilities. <br /> A. The user of banked water must notify the Division Engineer at least <br /> 24 hours prior to a request for delivery of water from the bank. <br /> Such notification must include the account number, date, time and <br /> • location of release. The Division Engineer will administer the <br /> 7 <br />