My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-090 Contract
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
CT2015-090 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 3:28:57 PM
Creation date
10/10/2014 10:51:04 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-090
C150402
Contractor Name
Ephraim Ditch Company
Contract Type
Loan
Water District
22
County
Rio Grande
Loan Projects - Doc Type
Default Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
S <br /> BORROWER: EPHRAIM DITCH COMPANY AGENCY NAME: COLORADO WATER <br /> APPROVED LOAN AMOUNT: $100,000 CONSERVATION BOARD/PDA <br /> LOAN SERVICE FEE: $1,000 CONTRACT TYPE: LOAN/PRIVATE <br /> LOAN AMOUNT: $101,000 CWCB CMS: 72269/CORE: CT2015-090 <br /> LOAN CONTRACT <br /> (STANDARD CONTRACT-WAIVER#160-APPROVED NOVEMBER 10,2003) <br /> THIS CONTRACT is made between the State of Colorado for the use and benefit of <br /> The Department of Natural Resources, Colorado Water Conservation Board ("CWCB" or <br /> "State"), and Ephraim Ditch Company, 18353 State Hwy 136, Sanford, CO, 81151, a <br /> Colorado nonprofit Corporation, ("BORROWER"), <br /> FACTUAL RECITALS <br /> 1. Authority exists in the law, and funds have been budgeted, appropriated and <br /> otherwise made available and a sufficient unencumbered balance thereof remains <br /> available for encumbering and subsequent payment of this CONTRACT;and <br /> 2. Required approval, clearance, and coordination have been accomplished from and <br /> with appropriate agencies; and <br /> 3. On May 22, 2014, the CWCB approved a loan request from the BORROWER for the <br /> Ephraim Diversion and Headgate Rehabilitation Project ("PROJECT"). This PROJECT is <br /> one of three projects collectively known as the Conejos River System Confluence <br /> Management Project (CMP). This PROJECT will replace the existing diversion <br /> structures and headgates and add measurement structures to the Ephraim Ditch. The <br /> total estimated project cost is $201,500. The total loan amount is $101,000 which <br /> includes a one percent (1%) loan origination fee of$1,000 at an interest rate of 1.75% <br /> for 30 years; and <br /> 4. The PROJECT SUMMARY, attached as APPENDIX 1 and incorporated herein, contains <br /> BORROWER Information (Section 1), the PROJECT Description (Section 2), CWCB's <br /> authority for making this loan (Section 3), and CWCB Approval and Legislative <br /> Authorization (Section 4), identifying the amount of the loan and the terms of <br /> repayment. The PROJECT SUMMARY also contains sections on BORROWER'S debt, <br /> collateral, procedures and eligible expenses. <br /> 5. The CWCB now desires, by this CONTRACT, to loan money to the BORROWER for this <br /> PROJECT upon mutually agreeable terms and conditions. <br /> THEREFORE, in consideration of the mutual and dependent covenants contained <br /> herein, the parties agree as follows: <br /> A. LOAN PROVISIONS <br /> 1. Loan Service Fee. The amount of the loan (LOAN AMOUNT) shall include (1) the <br /> amount of the funds loaned by the CWCB to the BORROWER for the PROJECT and (2) <br /> a service fee of one percent (1%) of the PROJECT amount. In the event that the <br /> Page 1 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.