Laserfiche WebLink
L-Q[EciwEr-h) <br /> L I D) <br /> Invoice <br /> /4 //411.2 <br /> L?-2 <br /> September 10, 2014 o i 604--- <br /> Platte River Recovery and Implementation Program <br /> Attn: Justin Brei/Jerry Kenny <br /> 4111 4th Ave, Suite 6 <br /> Kearney, NE 68845 <br /> For damages incurred/destruction to waterfowl hunting blind by PRRIP contractor. <br /> Location: Platte River between the Wood River and Alda Bridges <br /> Itemized Costs: <br /> 8 sheets 5/8" plywood P23.65 per sheet $189.20 <br /> Paint—2 gallons R$28.50 each $57.00 I <br /> 24 2x2's Cv$1.00 each $24.00 <br /> 6 2x4's p$2.00 each $12.00 <br /> 8 hinges @$2.50 each <br /> $20.00 <br /> 4 brackets for shelving @$2.40 each $9.60 <br /> Custom made fiberglass bottom 1 P$750.00 $750.00 <br /> 1 box 'A inch wood screws $8.50 <br /> --4 <br /> 1 box 3 inch wood screws $8.50 <br /> 4 metal anchor posts @$6.50 each $26.00 <br /> 30 foot cable for anchoring $30.00 <br /> 4 cable clamps p$2.20 each $8.80 <br /> Crawler Loader for installation 4hrs @150.00/hour <br /> (Equipment plus mobilization) 5600.00 <br /> Labor for construction and installation <br /> 10hrsp$40.00/hour $400.00 <br /> ti <br /> Total Due $2,143.60 I-- <br /> Thank you. <br /> Please remit payment to: <br /> Kirk Schroeder <br /> 4133 West Platte River Drive <br /> Doniphan, NE 68832 <br /> 308-383-8721 <br />