Laserfiche WebLink
Adaptive Management Plan Implementation <br /> Efforts during this period for AMP activities were focused on oversight of monitoring contractors, specific <br /> WC and T&P data analysis, development of materials for publication and/or peer review, and conducting <br /> summer field activities. Specific activities include: <br /> • Coordination and oversight of annual whooping crane monitoring data compilation and analysis. <br /> • Collaboration with WC Telemetry Project and Stop Over study on-going. <br /> • Coordination of USGS contractors and participation in T&P monitoring efforts underway. Staff <br /> time includes oversight, land surveys, and river surveys. <br /> • Oversight of website and database management system development and maintenance <br /> activities. <br /> • Coordination with RWBJV for data development and analysis of habitat suitability parameters at <br /> TAC's request on-going. <br /> • Coordination of June aerial CIR photography flight. <br /> • Compilation and analysis of T&P and Whooping Crane data nearing completion of <br /> comprehensive, uniform data sets. <br /> • Coordination of proposed peer review/publication subjects and timeline with various parties with <br /> very different opinions. <br /> • Data collected in association with check structures to create water retention capability in Morse <br /> tract wetlands compiled and ready for analysis. <br /> • Internal discussions regarding moving forward with Target Flow analysis on-going. <br /> • Revision of EDO authored papers on FSM in response to comments from ISAC and TAC <br /> completed. Considerable staff time has gone into this effort. <br /> • Coordination with TNC and RWBJV for development of an organizational framework and grant <br /> application to deal with in-channel vegetation management moving forward. <br /> • Coordination and participation in TAC meeting on June 23 in Kearney, NE <br /> Outreach and Operations <br /> • Routine daily operations associated with management and support of EDO staff, acquisition of <br /> supplies and equipment, oversight of consultant and contractor contracts and payment, <br /> maintenance of property files, coordination of meeting logistics, and general administration of <br /> Program. <br /> • Coordination and participation in FC call on June 3rd. <br /> • Coordination and participation in GC meeting on June 10 and 11 in Cheyenne, WY. <br /> Ovoe774 <br /> Jerry F. nny, Ph.D. Date <br /> 3 <br />