Laserfiche WebLink
SECTION 11 —TIME FOR PERFORMANCE <br /> PROJECT BEGINS: Upon Effective Date of this CONTRACT(the date this CONTRACT is signed <br /> by the State Controller or his designee). <br /> PROJECT END DATE: Three (3) years from the Effective Date of this CONTRACT. <br /> Appendix 1 to Loan Contract C150399 <br /> Page 4 of 4 <br />