My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-097 Contract
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
CT2015-097 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2014 1:46:00 PM
Creation date
10/6/2014 11:10:06 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-097
CMS73184
Contractor Name
Sterling Irrigation Company
Contract Type
Loan
Water District
64
County
Logan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 5—SCHEDULE OF EXISTING DEBT <br /> As of the date of the CWCB loan approval, the BORROWER has an existing loan with the <br /> Colorado Water Conservation Board, Contract #C150024, in the original amount of <br /> $318,583, with annual payments of $17,869. The loan has an estimated maturity date of <br /> 2030 and is in good standing. <br /> SECTION 6—LOAN SECURITY <br /> The COLLATERAL provided for this loan, as evidenced by the executed SECURITY <br /> AGREEMENT (Appendix 4) and DEED OF TRUST (APPENDIX 5) and incorporated herein, <br /> shall be a pledge of assessment revenues backed by a rate covenant and an undivided <br /> one hundred percent (100%) interest in the PROJECT, which includes the diversion and <br /> headgate structure, as more particularly described in the attached DEED OF TRUST <br /> ("COLLATERAL") which is incorporated herein. This is in accordance with CWCB Financial <br /> Policy#5 (COLLATERAL). <br /> SECTION 7—ADDITIONAL CONDITIONS&CONTRACT REQUIREMENTS <br /> NONE. <br /> SECTION 8—CONSTRUCTION FUND PROGRAM PROCEDURES <br /> A. The BORROWER shall employ an engineer, registered in the State of Colorado to <br /> prepare plans and specifications for the PROJECT. <br /> B. Engineering Contracts and the plans and specifications must be submitted to the <br /> CWCB staff for verification of compliance with the terms of this CONTRACT when <br /> available prior to bidding. Any modifications, to the plans and specifications that <br /> effect changes to the construction costs must be approved in writing by CWCB. <br /> C. For plans and specifications for all jurisdictional dams and reservoirs, as defined <br /> by § 37-87-105 C.R.S., the BORROWER shall provide a letter of approval from the <br /> State Engineer's Office prior to construction. <br /> D. The BORROWER shall notify CWCB of the bid opening date, time and location. <br /> CWCB staff may elect to attend the bid opening. <br /> E. CWCB must approve the award of the construction contract. <br /> F. The BORROWER shall contract for the construction of the work with responsible and <br /> capable Construction Firms, selected by the BORROWER and found acceptable by <br /> the CWCB staff. <br /> G. The BORROWER must provide a copy of the following construction contract <br /> documents: executed contractor's proposal, executed construction contract, <br /> executed performance bond, executed payment bond, executed notice of award, <br /> proposed notice to proceed, sample change order, and sample field order, as well <br /> as the advertisement for bid and bid bond at bidding. After the CWCB staff verifies <br /> that these documents comply with the terms of this CONTRACT, the BORROWER may <br /> Appendix 1 <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.