My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-085 Contract
CWCB
>
Loan Projects
>
DayForward
>
4001-5000
>
CT2015-085 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2014 12:22:52 PM
Creation date
9/25/2014 3:47:21 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-085
C150411B
Contractor Name
Denver Southeast Suburban Water and Sanitation District
Contract Type
Loan
Water District
8
County
Douglas
Arapahoe
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Summary— Denver Southeast Suburban Water& Sanitation District <br /> acting by and through its Water Activity Enterprise <br /> Contract No. C150411 B <br /> SECTION 1 —BORROWER INFORMATION <br /> Name: Denver Southeast Suburban Water & Sanitation District <br /> acting by and through its Water Activity Enterprise <br /> Type of Entity: A Colorado Title 32 Special District formed pursuant to <br /> and governed by Title 32, Article 1, C.R.S. <br /> Address: PO Box 1660, Parker, Colorado, 80134 <br /> Contact: Heather Beasley, District Manager <br /> Phone Number: 303-841-2797 <br /> E-mail address: hbeasley @pinerywater.com <br /> SECTION 2—PROJECT DESCRIPTION <br /> A. Description of PROJECT: This loan contract, to be used for the District's <br /> participation in the Water Infrastructure and Supply Efficiency Project (WISE)to <br /> reduce the District's dependence on non-renewable water sources,and specific to <br /> the Phase 1 Infrastructure is defined as the "PROJECT". The Phase 1 Infrastructure <br /> project components included in this phase include a temporary direct connection <br /> to Aurora's distribution system to provide short-term deliveries, and modifications <br /> to the ECCV Western Pipeline necessary to make WISE water deliveries. Local <br /> components consist of several turnouts to be constructed to deliver water directly <br /> to WISE participants with systems adjacent to the pipeline. Additional pump <br /> stations will be constructed to deliver water to storage in Rueter-Hess Reservoir <br /> and convey water to participants located south of Rueter-Hess Reservoir. This <br /> phase includes two pump stations, and 45 miles of new pipelines varying <br /> between 8- and 42- inches in diameter. The District's total participation cost is <br /> estimated to be $10,920,000. The CWCB approved a total loan amount not to <br /> exceed $9,926,280, for the District's participation cost of WISE. The loan amount <br /> for this contract,for the Phase 1 Infrastructure is $6,199,380 which includes a one <br /> percent(1%) loan service fee of$61,380. <br /> B. Description of Feasibility Study: The CWCB has reviewed a feasibility study report <br /> dated October 23, 2013 on the PROJECT, titled "Water Infrastructure and Supply <br /> Efficiency Project Loan Feasibility Study,"which was prepared by Black &Veatch, <br /> on behalf of the WISE Authority. This study includes an alternative analysis, <br /> conceptual design descriptions, exhibits, cost estimates, and financial statements <br /> audited by L. Paul Goedecke, PC, and current financial information provided by <br /> Debra L. Sedgeley of CliftonLarsonAllen LLP. Additional clarification and <br /> information was provided by Eric Hecox and Rick Marsicek, P.E. of South Metro <br /> Water Supply Authority. Based upon the feasibility report, the CWCB determined <br /> the PROJECT to be technically and financially feasible. <br /> Appendix 1 to Loan Contract C150411 B <br /> Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.