My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting Memorandum 09/05/2003
CWCB
>
Board Meetings
>
DayForward
>
1001-2000
>
Board Meeting Memorandum 09/05/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2014 2:26:01 PM
Creation date
9/10/2014 2:25:59 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/5/2003
Description
Non Reimbursable Projects CWCB/Division of Water Resources Satelllite Monitoring System
Board Meetings - Doc Type
Hearings
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> funded for flood hardening through this program. In addition,flood-warning systems may be <br /> implemented as part of this effort for at-risk communities.This is an ongoing joint request • <br /> between CWCB and DWR. The allocation of these funds for specific projects is managed <br /> jointly between the DWR and CWCB. (See attached DWR memo) <br /> Update existing USGS gages with High Data Rate Satellite Monitoring equipment. $ 3.5,000 <br /> This project entails updating approximately 5 USGS gages,which are of interest to the CWCB <br /> with High Data Rate Satellite Monitoring equipment. These gages are currently being operated <br /> and maintained by the USGS through their co-op programs,however the sites do not have <br /> satellite telemetry capability,which would aid the CWCB floodplain, Stream and Lake <br /> Protection,Compact, and DSS programs. A list of gages that have been updated through this <br /> ongoing project,as well as gages left to be updated has been compiled and is available for <br /> review. <br /> Installation of new stream flow gages. $ 30,000 <br /> This project entails the installation of new staff gages,data loggers and fully equipped Satellite <br /> Monitoring Stations.These gages will be installed by the USGS,DWR or others and may <br /> include funding for operation and maintenance for one year. CWCB will attempt to bring in <br /> other stakeholders to share in the future O&M costs. <br /> Gaging Related Equipment Purchases. $ 10,000 <br /> This funding is necessary to update and maintain equipment used for the Gaging Program and <br /> to provide for ongoing staff training. Examples of ongoing purchases include mapping software <br /> updates,survey and portable gaging equipment purchases and/or repairs, computer hardware <br /> upgrades and associated software. <br /> Total $260,000 <br /> DWR Request • <br /> Controlled maintenance of the Satellite Monitoring System is an authorized non-reimbursable expense <br /> from the Construction Fund(Section 37-60-121 (1)(b)(II), CRS), and it is included in the Board's Long Term <br /> Financial Projection. Staff recognizes the value of continuing collection of real-time streamflow data and the <br /> benefits to all of the CWCB's programs. Staff will be working hard with the DWR and other entities to more <br /> thoroughly incorporate the Satellite Monitoring System into the CWCB's expanding gaging program. The <br /> details of the DWR Satellite Monitoring System funding request are explained in detail in the attached memo <br /> from Hal Simpson to Rod Kuharich dated August 14, 2003. <br /> Recommendation <br /> Staff recommends that the Board request the General assembly authorize$210,000 from the <br /> Construction Fund to be appropriated to the Colorado Water Conservation Board for flood forecasting and <br /> warning, instream flow monitoring, compact protection, and decision support system data collection efforts; <br /> $50,000 for stream gage flood hardening projects; and$303,000 from the Construction fund to be appropriated <br /> to the Department of Natural Resources for allocation to the Division of Water Resources to enhance,renovate, <br /> and replace the Data Collection Platforms in the existing satellite monitoring system. The total cost of this joint <br /> gaging effort is $ 563,000. <br /> 1111 <br /> Flood Protection•Water Project Planning and Financing•Stream and Lake Protection <br /> Water Supply Protection•Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.